  Evaporator_2  Not logged in ELOG logo
Entry  Monday, March 19, 2012, 17:10, Nikita Bernier, BeO, Target boat #1, , Done, Sintering BeO pellets 
    Reply  Tuesday, March 20, 2012, 14:39, John Wong, BeO, Target boat #1, , Done, Sintering BeO pellets 
    Reply  Thursday, March 22, 2012, 00:34, John Wong, BeO, Target boat #1, , Done, Sintering BeO pellets voltage_limiting.jpgTemp_-_Cal_vs_Measured.JPGTGHT_525A.JPG
    Reply  Thursday, March 22, 2012, 17:56, Nikita Bernier, BeO, Target boat #1, , Done, Sintering BeO pellets 
Message ID: 8     Entry time: Tuesday, March 20, 2012, 14:39     In reply to: 6
Author: John Wong 
Target Material: BeO 
Target Oven W.O#: Target boat #1 
Source:  
Status: Done 
Subject: Sintering BeO pellets 

Nikita Bernier wrote:

 Monday, March 19, 2012, 17:04

 

Target boat contains 4 BeO pellets with 30% PVB:

Sample,   Thickness (mm),   Mass (g),  Density (g/cm3)

1   4.943,  0.9628,  1.265

2  4.930,  0.9685,  1.276

3  4.758,  0.9607,  1.312

4  4.979,  0.9872,  1.288

 

Target chamber is currently being pumped down. Leak check will be done tomorrow by turning on the cooling water for the heat shield. 

 

 Tuesday, March 20, 2012, 14:35

It was found out that the Evaporator #2 backing pump (IEVAP2BP1) muffler is not connected to the exhaust system.  The sintering process is on hold until the pump is properly setup (see message ID#7 for more details). 

 


 