Message ID: 443     Entry time: Tuesday, May 14, 2019, 13:57
Author: Aaron Schmidt 
Target Material:  
Target Oven W.O#:  
Source: LP-FEBIAD 
Status: Done 
Subject: Test FEBIAD 

 Tuesday, May 14, 2019, 13:56: Removed old HS w/ flexible lines & swapped in the FEBIAD. (HS waterlines are still purged.) Roughing.

Tuesday, May 14, 2019, 14:06: Turbo pump on. 

Tuesday, May 14, 2019, 14:22: Waterlines opened. Vacuum ok @ 5.34e-05T & dropping. 


Wednesday, May 15, 2019, 06:21

IGP1 = 5.99e-7 Torr,

manually tapping to 40 A.

Autoramp set to 2A/min to TGHT=580 A and TBHT=290 A


Tuesday, May 21, 2019, 08:13

IGP1= 1.43e-7 Torr

TGHT = 580.875 A, 11.22 V

TBHT =  4.45 V, 309.219 A

Temperature 1004 C measured at Ta foil

Ramp-down was initiated with IGP1 = 1.423e-07 Torr

Ramp rate = 2A/min for TGHT and 1/min for TBHT

EVAP2 was vented with air


 Tuesday, May 21, 2019, 14:20 Test FEBIAD removed - AS.