  Evaporator_2  Not logged in ELOG logo
Message ID: 459     Entry time: Thursday, September 26, 2019, 14:03
Author: Aaron Schmidt 
Target Material: Nb 
Target Oven W.O#: 41882-3 
Source: TARGET BOAT 
Status: In progress 
Subject: HS swap & test Nb target 

 HS# 42752-7

Thursday, September 26, 2019, 13:46: Remove Flexible lines HS

Thursday, September 26, 2019, 14:03: Assy installed.


Friday, September 27, 2019, 07:07: Vacuum @ 1.16e-06T. 

Friday, September 27, 2019, 07:09: Waterlines opened. Vacuum stable @ 1.15e-06T 


Monday, September 30, 2019, 10:04: Remove Nb target & assy. Install flexible line HS. 