Entry  Wednesday, March 06, 2013, 10:41, Anders Mjos, Empty, 38481-4, HP-FEBIAD, Done, CTL thermal test CTL_1st_Assebmly_Thermal_Test_Evap2.pdf2013-03-08_Evap2_First_Thermal_Test.pdf
    Reply  Wednesday, March 06, 2013, 17:53, John Wong, Empty, 38481-4, HP-FEBIAD, Done, CTL thermal test rampingup_1.PNGrampingup_2.PNGautorampingdown_23.PNG
    Reply  Monday, March 11, 2013, 12:23, Anders Mjos, Empty, 38481-4, HP-FEBIAD, Done, CTL thermal test 2 2013-03-11_Evap2_Second_Thermal_Test.pdf
       Reply  Monday, March 11, 2013, 15:59, John Wong, Empty, 38481-4, HP-FEBIAD, Done, CTL thermal test 2 autorampingup_110.PNG
Message ID: 60     Entry time: Wednesday, March 06, 2013, 10:41     Reply to this: 61   62
Author: Anders Mjos 
Target Material: Empty 
Target Oven W.O#: 38481-4 
Source: HP-FEBIAD 
Status: Done 
Subject: CTL thermal test 

Wednesday, March 06, 2013

The Cool Transfer Line (CTL) test target is installed for thermal tests. Drawing number is ITD0431 REV A.

Thermocouple channels are as follows:

T1: Cu block on CTL
T2: Heat Shield above CTL
T3: Heat Shield cooling water Supply
T4: Heat Shield cooling water Return

Cooling water is in Evap2 supplied to the cooling line that goes directly to the area on the Heat Shield above the CTL.

Test results attached.
 

Attachment 1: CTL_1st_Assebmly_Thermal_Test_Evap2.pdf  299 kB  Uploaded Wednesday, March 06, 2013, 13:50  | Show | Hide all
Attachment 2: 2013-03-08_Evap2_First_Thermal_Test.pdf  981 kB  Uploaded Monday, March 11, 2013, 16:04  | Show | Hide all