Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Evaporator_2  Not logged in ELOG logo
Message ID: 419     Entry time: Tuesday, September 11, 2018, 10:47
Author: Aaron Schmidt 
Target Material:  
Target Oven W.O#:  
Source:  
Status:  
Subject: Evap 2 step discrepancy  

 Tuesday, September 11, 2018, 10:45:

TGHT: 53.4 A   TBHT: 57.75

Actual

TGHT: 60.0A  TBHT: 59.0A

Uploaded the rest to Word doc. Screenshots included.

Attachment 1: PS_Check.docx  238 kB  Uploaded Wednesday, September 12, 2018, 09:39
ELOG V2.9.2-2455