Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Evaporator_2  Not logged in ELOG logo
Entry  Thursday, December 07, 2017, 10:03, Laura Lambert, Endcaps, , TARGET BOAT, In progress, Sintering TaC coating on endcaps and springs 
    Reply  Thursday, December 07, 2017, 11:56, Laura Lambert, Endcaps, , TARGET BOAT, Problems, Sintering TaC coating on endcaps and springs trip_due_to_new_vacuum_limits_not_being_updated_properly.JPG
       Reply  Friday, December 08, 2017, 15:29, Laura Lambert, Endcaps, , TARGET BOAT, Problems resolved, Sintering TaC coating on endcaps and springs 
          Reply  Friday, December 08, 2017, 15:42, Laura Lambert, Endcaps, , TARGET BOAT, Done, Sintering TaC coating on endcaps and springs 
Message ID: 395     Entry time: Thursday, December 07, 2017, 10:03     Reply to this: 396
Author: Laura Lambert 
Target Material: Endcaps 
Target Oven W.O#:  
Source: TARGET BOAT 
Status: In progress 
Subject: Sintering TaC coating on endcaps and springs 

 Thursday, December 07, 2017, 09:57

Each endcap is wrapped in a separate piece of graphite foil and placed in a target boat.

There are also 4 coated springs, 2 on each side of the stack of endcaps.

The boat is wrapped with 3-layers of Ta heatshields.

Chamber pumped down overnight.

OMEGA slope = 0.98

HS water valves opened, no leaks detected.

IGP1 = 5.9e-7 Torr

IGP2 = 4.0e-7 Torr

Tapping up manually.

Final desired temperature = 1800C


 

ELOG V2.9.2-2455