Author: Ferran Boix Pamies 
Target Material: Empty 
Target Oven W.O#:  
Source: TARGET BOAT 
Status: Done 
Subject: parasitic target thermal tests v2, foil measurement. 

 2021-07-21 4:44pm Vacumm at 1e-5Torr. Water cooling leak check ok.

 2021-07-21 4:54pm ramping up TGHT to 200A 1A/10s.

2021-07-21 5:31pm 200A TGHT, TC 94degC pyro 1100degC. TC very low, ramping down and venting.

2021-07-22 5:00pm Parasitic prototype target installed, Vacuum 3e-5T, leak check ok. Power on HE of parasitic target.

2021-07-22 5:14pm vacuum 2e-5T. Ramping up container to 100A , 1A/10s.

2021-07-22 5:33pm vacuum 1e-5T. All good at 100A. Ramping up container to 200A , 1A/10s.

2021-07-22 5:54pm vacuum 8.2e-6T. All good at 200A pyro at 1100degC. Ramping up container to 300A , 1A/10s.

2021-07-22 6:15pm vacuum 7.6e-6T. All good at 300A pyro at 1420degC. Ramping up container to 400A , 1A/10s.

2021-07-22 6:36pm vacuum 8e-6T. All good at 400A pyro at 1700degC. Ramping up container to 500A , 1A/10s.

2021-07-22 6:57pm vacuum 1e-5T. All good at 500A pyro at 1960degC. Ramping up container to 553A , 1A/10s.

2021-07-22 7:13pm vacuum 1e-5T. All good at 553A pyro at 2100degC.

2021-07-22 7:36pm Ramping down 1A/10s.

2021-07-23 10:00am Venting.