Entry  Monday, June 29, 2015, 16:18, Laura Lambert, Empty, 41369-2, LP-SIS, In progress, Sintering TaC coating container 
    Reply  Monday, June 29, 2015, 23:42, John Wong, Empty, 41369-2, LP-SIS, In progress, Sintering TaC coating container 
       Reply  Tuesday, June 30, 2015, 09:50, Laura Lambert, Empty, 41369-2, LP-SIS, In progress, Sintering TaC coating container LP-SIS_july3_2015_(1).jpgLP-SIS_july3_2015_(2).jpgLP-SIS_july3_2015_(3).jpgLP-SIS_july3_2015_(4).jpg
          Reply  Monday, July 06, 2015, 12:07, John Wong, Empty, 41369-2, LP-SIS, In progress, Sintering TaC coating container Screen_Shot_2015-07-06_at_11.52.16_AM.png
             Reply  Monday, July 06, 2015, 16:30, Laura Lambert, Empty, 41369-2, LP-SIS, Done, Sintering TaC coating container July_10_2015_-_2nd_round_sintering_-_coating_(1).jpgJuly_10_2015_-_2nd_round_sintering_-_coating_(2).jpgJuly_10_2015_-_2nd_round_sintering_-_coating_(3).jpgJuly_10_2015_-_2nd_round_sintering_-_coating_(4).jpg
Message ID: 227     Entry time: Tuesday, June 30, 2015, 09:50     In reply to: 226     Reply to this: 228
Author: Laura Lambert 
Target Material: Empty 
Target Oven W.O#: 41369-2 
Source: LP-SIS 
Status: In progress 
Subject: Sintering TaC coating container 

John Wong wrote:

Laura Lambert wrote:

 Monday, June 29, 2015, 16:17

Target container is coated with TaC. No Ta-heat shields are used.

TGHT will be ramped up to 580A at 0.2A/min.

TBHT will be ramped up to 230A at 01A/min.

Chamber is currently being pumped down.


 

 Monday, June 29, 2015, 23:37

Opened the HS valves around 5pm.  Small leaks or just a vibration in the pipe line caused a rise in vacuum.  Leak rate is small, so allow the chamber to continue to pump down over night.

Sintering process can begin tomorrow if vacuum is allowed.


 

 Tuesday, June 30, 2015, 08:22

IGP1 = 3.6e-7 Torr.

Tapped up manually to 40A.

Vacuum looks good.

IGP1 = 6.9e-7 Torr.

Inititating auto-ramp...


 Thursday, July 02, 2015, 09:56

IGP1 = 8.9e-7 Torr.

OMEGA = 1728C

TGHT and TBHT = 580A and 230A respectively.

Tapping up manually to 1800C.


 Thursday, July 02, 2015, 11:02

TGHT = 615A, 10.9V

OMEGA = 1800C

IGP1 = 1.1e-6 Torr.

Will continue to heat for 4hrs.


 Thursday, July 02, 2015, 15:43

Target container remained at 1800C for 4hrs50min.

Initiating auto-cool for TGHT = 2A/min and TBHT = 1A/min.


 Friday, July 03, 2015, 08:24

Vented in air and opened up this morning.

Edge of container on both ends not fully sintered [see photos]


 

Attachment 1: LP-SIS_july3_2015_(1).jpg  2.936 MB  Uploaded Friday, July 03, 2015, 10:41  | Show | Hide all
Attachment 2: LP-SIS_july3_2015_(2).jpg  2.802 MB  Uploaded Friday, July 03, 2015, 10:41  | Show | Hide all
Attachment 3: LP-SIS_july3_2015_(3).jpg  2.772 MB  Uploaded Friday, July 03, 2015, 10:41  | Show | Hide all
Attachment 4: LP-SIS_july3_2015_(4).jpg  2.547 MB  Uploaded Friday, July 03, 2015, 10:41  | Show | Hide all