Entry  Wednesday, August 17, 2016, 17:31, Laura Lambert, Empty, 39814-V2-1, LP-IG-LIS, In progress, sintering TaC coating on SiC#34 container...round2 leak.JPGwater_leak.JPEG
    Reply  Tuesday, August 23, 2016, 12:15, John Wong, Empty, 39814-V2-1, LP-IG-LIS, Done, sintering TaC coating on SiC#34 container...round2 
Message ID: 316     Entry time: Tuesday, August 23, 2016, 12:15     In reply to: 314
Author: John Wong 
Target Material: Empty 
Target Oven W.O#: 39814-V2-1 
Source: LP-IG-LIS 
Status: Done 
Subject: sintering TaC coating on SiC#34 container...round2 

Laura Lambert wrote:

 Wednesday, August 17, 2016, 17:30

Container coated with TaC using 'flushing technique', cleaned ionizer tube with acetone, so no coating inside ionizer tube

Wrapped with 3 x Ta heat shields, incl center block

Currently pumping down in evap2


Thursday, August 18, 2016, 10:14 

HS water valves opened...leak detected  see attachment for photo from archives

Vented and opened up.

Anders performed leak check, nothing found.

Replaced all seals with blue seals.

Pumping down now


 Thursday, August 18, 2016, 16:12

HS water valves opened...leak detected again  see attachment for photo of striptool

Vented and opened up.

working with Anders on finding leak...


 Monday, August 22, 2016, 10:38

leaks FIXED!

HS water valves opened, NO leaks detected!

Tapped up manually to 70A

Vacuum stable, IGP1 = 2.5e-6 Torr

Initiating auto ramp for TGHT @ 0.2A/min to a max setpoint of 350A

Initiating auto ramp for TBHT @ 0.1A/min to a max setpoint of 230A

Once max setpoints achieved, will tap up manually to final desired temperature of 1900C


 Monday, August 22, 2016, 14:58

TGHT = 115A, 1.3V

TBHT = 89A, 0.97V

IGP1 = 4.1e-7 Torr.

Increasing ramping rate to 1.0A/min and 0.5A/min for the TGHT and TBHT respectively.


 Monday, August 22, 2016, 16:01

IGP1 = 1.25e-6 torr

TGHT = 174A, 2.2V

TBHT = 118A, 1.4V

Lowering ramping rate to 0.2A/min and 0.1A/min for the TGHT and TBHT respectively for overnight ramping.


 

 Tuesday, August 23, 2016, 12:14

Initiate TGHT autoramping to 400A at 2A/min.  Vac 3.5e-7 Torr. 


 Tuesday, August 23, 2016, 14:48

TGHt tapped up to 420A/7.01V.  Local temp read at ~1900C.  Will sinter at this temp for a few hours before cooling down.


 Tuesday, August 23, 2016, 17:20

TGHT at been at 420A/7.01V for over 4 hours.  Vac at 4.8e-7 Torr.

Cooling TGHT and TBHT at 1A/min.


 Wednesday, August 24, 2016, 10:35

TGHT/TBHT at 0A.

Venting chamber.

Container looks good.


 