Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Evaporator_2  Not logged in ELOG logo
Message ID: 4     Entry time: Tuesday, February 28, 2012, 11:00
Author: John Wong 
Target Material: Empty 
Target Oven W.O#: Test oven  
Source: LP-SIS 
Status: Done 
Subject: Measuring temperatures, currents & voltages 

 Tuesday, February 28, 2012, 10:36

Two thermocouples were inserted through the left side of the copper heat shield, see attachment #1.  One thermocouple is attached to the target tube with a Ta-wire, and the other is attached to the back block.

Data gathering: 

1.  Target heater (IEVAP2:TGHT) setpoint current/voltage  

2.  Target heater (IEVAP2:TGHT) readback current/voltage

4.  Tube heater (IEVAP2:TBHT) setpoint current/voltage

3.  Thermocouples voltages & controls' readback (IEVAP2:TCM) 


 

 

Attachment 1: Evap_2_thermocouple.jpg  1.307 MB  | Show | Hide all
ELOG V2.9.2-2455