  Evaporator_2  Not logged in ELOG logo
Message ID: 686     Entry time: Thursday, March 20, 2025, 06:10
Author: Darwin Ortiz Rosales 
Target Material: Empty 
Target Oven W.O#: 45447-19 
Source: LP-SIS 
Status: Done 
Subject: TaC coating sintering 

Wednesday, March 19, 2025, 13:08

The coated container was wrapped in 4 Ta foil heatshields.

Vacuum IGP1 initial =

Target temperature on OMEGA= 1800-1850 C

OMEGA slope:= 0.990

Target time at max temperature = 4 hours

Final Current TBHT= 230 A

Final TGHT current= ~400A (adjustable)

Good vacuum = 5.0 e-04 Torr

Bad vacuum = 5.0E-02 Torr


Thursday, March 20, 2025, 06:10 

IGP1 initial = 6.1e-7 Torr

 start ramp at 2A/min


Thursday, March 20, 2025, 07:04

paused ramp to prevent pressure spike


Thursday, March 20, 2025, 10:16

OMEGA 1800 C @ TGHT = 402A, 6.8V

Will leave for 4 hours.


Thursday, March 20, 2025, 13:53

Starting rampdown at 2A/min TGHT and 1A/min TBHT