Thursday, December 01, 2016, 16:06
Container coated with TaC using 'flushing technique' and let dry overnight.
Cleaned ionizer tube with acetone, no coating inside ionizer tube
Wrapped with 3 x Ta heat shields, incl center block
Currently pumping down in evap2
OMEGA slope = 0.98
Friday, December 02, 2016, 11:24
Opened up HS water valves, no leaks detected.
Tapped up manually to 35A.
Waited ~25min, vacuum stable.
IGP1 = 1.65e-6 Torr
Initiating auto-ramp at 0.2A/min for the TGHT and 0.1A/min for the TBHT.
Max setpoints set for 350A and 230A for the TGHT and TBHT respectively.
Once max setpoints achieved, will tap up manually to final desired temperature of 1900C
Monday, December 05, 2016, 09:38
TGHT = 350A, 5.38V
TBHT = 230A, 4.03V
OMEGA = 1550C
IGP1 = 3.2e-7 Torr
Tapping up to 1900C...
Monday, December 05, 2016, 14:11
OMEGA = 1905C
TGHT = 475A, 7.63V
TBHT = 230A, 4.07V
IGP1 = 8.5e-7 Torr
Tuesday, December 06, 2016, 08:41
TGHT = 475A, 7.76V
TBHT = 230A, 4.07V
IGP1 = 3.9e-7 Torr
Initiating auto-cool at 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.
Wednesday, December 07, 2016, 08:46
Evap2 was vented in air and opened up yesterday afternoon.
Container looks good, coating fully sintered.
|