Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Evaporator_2  Not logged in ELOG logo
Message ID: 64     Entry time: Wednesday, March 13, 2013, 16:08
Author: Anders Mjos 
Target Material: Empty 
Target Oven W.O#: 38481-4 
Source: HP-FEBIAD 
Status: Done 
Subject: Thermal test 

Wednesday, March 13, 2013 

Thermocouple channels (see attached PDF for photos)
T1 - Left target leg at tube
T2 - Between cooling fins close to tube, left side
T3 - Supply water HS
T4 - Return water HS


Friday, March 22, 2013

Test not conducted. Target removed.

Attachment 1: HP-FEBIAD-A_TC_at_fins.pdf  319 kB  | Show | Hide all
ELOG V2.9.2-2455