Message ID: 429     Entry time: Thursday, February 07, 2019, 15:20
Author: Darwin Ortiz Rosales 
Target Material: Empty 
Target Oven W.O#: 43630-1 
Source:  
Status: Done 
Subject: TaC coating/sintering 

Thursday, February 07, 2019, 14:12

Tantalum tube coated with TaC and wrapped with 3 layers of Ta heat-shielding.

Desired temperature= 1900 Celsius (expected TGHT ~445A/7.5V)

EVAP2 Currently pumped down, heating will be initiated tomorrow.


Friday, February 08, 2019, 08:46

Current pressure IGP1 = 3.46e-07 Torr

Manual tapping to 50A on TGHT

TGHT 47.43A, 0.26V

Waiting for pressure to stabilize.


Pressure was going down so current was increased manually to 65 A to induce the outgassing.

TGHT 73.9A, 0.67V

MAx pressure IGP1 = 4.41e-6 Torr

After approx 1 hour

TGHT = 0.70 V  74.1 A

IGP1 = 1.63 e-6 Torr

Autoramp was set to 2 A/min for final current of 350 A

 


 Friday, February 08, 2019, 13:43

Autoramp TGHT reached 350 A /5.47 V, current temperature at 1660 Celsius

IGP1 = 3.0e-06 Torr/coming down

Increase TGHT to 400 A autoramp at 2A/min


 Friday, February 08, 2019, 14:39

TGHT reached 413 A, 6.8 V, pressure at 1.9 e-06 Torr coming down

Continue to tap up TGHT to reach 1900 C


Friday, February 08, 2019, 14:56

TGHT manually increased to 428 A, 7.18V, pressure at 2.0e-06 Torr coming down slowly

Temperature at 1903 C

Will continue to heat at ~1900 C for four hours before cooling down


 Friday, February 08, 2019, 21:00

TGHT 7.21 V, 429.75 A, 1873 C

IGP1 6.77e-7 Torr

The heater ramp is set to -2 A/min to 0 A.