Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Evaporator_2  Not logged in ELOG logo
Message ID: 436     Entry time: Wednesday, April 03, 2019, 16:59
Author: Marla Cervantes 
Target Material: TaC 
Target Oven W.O#: 43630-5 
Source:  
Status: Done 
Subject: TaC coating/sintering for graphite insert test 

 Wednesday, April 03, 2019, 16:57

Tantalum tube was coated with TaC and wrapped with Ta heat-shield (3 layers)

Desired temp = 1900 C (expected TGHT ~445A/7.5V).

EVAP2 currently pumping down.


 Thursday, April 04, 2019, 05:12

IGP1 = 4.5e-7 Torr

The current is tapped manually to 40 A

After1 hour IGP1 = 1.18e-6 Torr, the autoramp was set to 1 A/min to 400 A


Thursday, April 04, 2019, 18:58

After 4 hours at ~1900 C:

IGP1 = 6.13e-7 Torr 

TGHT = 6.74 V, 416.06 A

ELOG V2.9.2-2455