  Evaporator_2  Not logged in ELOG logo
Message ID: 400     Entry time: Wednesday, December 13, 2017, 10:55
Author: Laura Lambert 
Target Material: Empty 
Target Oven W.O#: 39530-3 
Source: LP-FEBIAD 
Status: Done 
Subject: Temperature measurements for ARIEL 

 Wednesday, December 13, 2017, 10:36

LP-FEBIAD loaded into evap2 this morning and pumped down.

Temperature measurements of the ionizer will be done by Fernando for ARIEL development.

Ta foil covering side holes on heat shield so no temp measurements can be done using OMEGA on side ports of evaporator as per request of Fernando

No Ta heat shields on container.

HS water valves opened, no leaks detected.

IGP1 = 2.3e-6 Torr

IGP2 = 1.7e-6 Torr

Tapped up to TGHT = 50A, 0.30V; TBHT = 50A, 0.59V

IGP1 = 1.8e-6 Torr

IGP2 = 1.4e-6 Torr

Initiating auto ramp for TGHT at 2.0A/min up to 350A and TBHT at 1.0A/min up to 210A


 Wednesday, December 13, 2017, 14:53

IGP1 = 7.6e-7 Torr

IGP2 = 6.4e-7 Torr

TGHT = 350A, 5.85V

TBHT = 210A, 3.02V

TGHT and TBHT will be adjusted accordingly for temperature measurements...


Thursday, December 14, 2017, 09:16 

IGP1 = 2.1e-7 Torr

IGP2 = 1.7e-7 Torr

TGHT = 385A, 6.80V

TBHT = 210A, 3.01V

Tapped up to TGHT = 400A, 7.11V

Stopped for temperature measurements.

Tapped up to TGHT = 450A, 8.20V


 Friday, December 15, 2017, 09:50

IGP1 = 1.2e-7 Torr

IGP2 = 9.6e-8 Torr

TGHT = 350A, 5.82V

TBHT = 210A, 2.94V

Initiating auto-ramp to TGHT = 650A


Monday, December 18, 2017, 10:43

Temperature measurements done.

Initiated auto-cool.

TGHT cooling at 2.0A/min and TBHT at 1.0A/min.


 Tuesday, December 19, 2017, 11:40

Vented in air and removed from evap2 today.


 