Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Evaporator_2  Not logged in ELOG logo
Message ID: 523     Entry time: Thursday, November 05, 2020, 15:13
Author: Ferran Boix Pamies 
Target Material: Empty 
Target Oven W.O#: 41882-2 
Source: TARGET BOAT 
Status: Done 
Subject: cleaning treatment. 

 2020-11-05 15:44 empty and naked boat in for heating up system and clean up. Turbo on.

 2020-11-06 16:58 IGP1:4e-7T leak check ok. Ramping up target to 500A. 1A/10s.

 2020-11-09 12:43 The target was left at 1500degC during the weekend. 

 2020-11-17 14:11 turbo pump off. Slow venting.

 2020-11-18 09:18 Evap2 vented. Target removed.

ELOG V2.9.2-2455