Thursday, March 07, 2019, 09:09
Transfer tube from Legnaro was coated with TaC.
The transfer tube was set in a tantalum boat and wrapped with 3 heat shields,
the legs of the transfer tube were let out of the shielding sheets.
Chamber pump down was started on Wednesday March 06, 2019.
Desired temperature TGHT = 1800 C, Omega slope set = 0.990.
IGP1= 4.48e-07 Torr
Will tap up TGHT manually to 40-50 A and monitor pressure.
Thursday, March 07, 2019, 10:57
The TGHT current was left at 40 A for 50 min, the pressure achieved was 6.15e-7 Torr
The TGHT was rised to 45 A 11:00 am the pressure rised to 6.18e-7 Torr (11:10am)
The TGHT was rised to 50 A 11:10 am the pressure rised to 6.81e-7 Torr (11:32am)
auto ramp was set to 1 A/min to 300 A
Good vacuum 3e-5 Torr
Bad vaccum 5e-5 Torr
auto ramp was set to 1 A/min to 400 A
auto ramp was set to 1 A/min to 470 A
Final conditions TGHT = 485 A, 8.25V Temperature = 1800 C
The transfer tube stayed at 1800 C for 4 hours
auto ramp was set to -1 A/min to 0 A.
Friday, March 08, 2019, 16:53
EVAP2 was vented with air and the transfer tube was unloaded |