Thursday, September 25, 2014, 17:32
Target boat is filled with Ta-coated endcaps. The caps are stacked together. In between each cap, a piece of graphite foil is used for separation so the Ta caps would not fused.
See link for photos:
https://www.dropbox.com/sh/rydtdho6ggh4l3l/AAAYmvqT0mVQ_pnz4iecS4ksa?dl=0
The boat is wrapped with 3-layers of heatshields. The chamber is currently being pumped down.
TGHT will be ramped up to 580A and the temperature will be measured.
Monday, September 29, 2014, 11:12
TGHt was stepped up to 40A on last Friday and chamber continues to pump down over the weekend.
Vac @ 2.56e-6 Torr, mp @ 19mTorr.
Ramping up TGHT 580A at 1.0A/min.
Monday, September 29, 2014, 11:50
TGHT tripped off at 53A. Reduce ramping rate to 0.5A/min for now.
Monday, September 29, 2014, 16:17
Vacuum is coming down to 9.5e-7 Torr. Increased ramping rate to 1.0A/min.
Tuesday, September 30, 2014, 11:59
TGHT reached to 580A/10.18V. Target has been heated at that current for almost 12 hrs. Vac @ 4.9e-7 Torr.
Local temp measured with Mikron = (1500C + 250 C correction) = 1750C
Cooling down at 2A/min.
Thursday, October 02, 2014, 11:13
The coating is fully sintered; no sign of any damage on the endcaps.
Process is successful.
|