Evaporator_2 |
Not logged in |
|
|
Wednesday, March 06, 2013, 10:41, Anders Mjos, Empty, 38481-4, HP-FEBIAD, Done, CTL thermal test
|
Wednesday, March 06, 2013, 17:53, John Wong, Empty, 38481-4, HP-FEBIAD, Done, CTL thermal test
|
Monday, March 11, 2013, 12:23, Anders Mjos, Empty, 38481-4, HP-FEBIAD, Done, CTL thermal test 2
|
Monday, March 11, 2013, 15:59, John Wong, Empty, 38481-4, HP-FEBIAD, Done, CTL thermal test 2
|
|
Message ID: 63
Entry time: Monday, March 11, 2013, 15:59
In reply to: 62
|
Author: |
John Wong |
Target Material: |
Empty |
Target Oven W.O#: |
38481-4 |
Source: |
HP-FEBIAD |
Status: |
Done |
Subject: |
CTL thermal test 2 |
|
|
Anders Mjos wrote: |
Anders Mjos wrote: |
Wednesday, March 06, 2013
The Cool Transfer Line (CTL) test target is installed for thermal tests. Drawing number is ITD0431 REV A.
Thermocouple channels are as follows:
T1: Cu block on CTL
T2: Heat Shield above CTL
T3: Heat Shield cooling water Supply
T4: Heat Shield cooling water Return
Cooling water is in Evap2 supplied to the cooling line that goes directly to the area on the Heat Shield above the CTL.
|
Monday, March 11, 2013
The CTL test target was installed again for a second thermal test. CTL block fastened to HS with 1 in lbs. A small piece of Ta-foil of 0.001" thickness was used between the CTL Cu-block and the Ta transfer line to reduce the heat transfer..
Thermocouples were re-attached to CTL and Heat Shield (see above for channels #s).
|
Monday, March 11, 2013, 15:55
Chamber was pumped down to 2 e-7 Torr. HS water valve opened and no leaks were detected.
TGHT and TBHT are ramping up to 850A and 300A at 2A/min, respectively.
RGA is running...
Tuesday, March 12, 2013, 10:44
TGHT/TBHT reached to max currents.
See attachment #1 for temperature and RGA measurements.
Cooling down in process... 5A/min.
|
|