Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Evaporator_2  Not logged in ELOG logo
Entry  Thursday, September 24, 2015, 09:48, Laura Lambert, Empty, 41077-5, , In progress, Sintering TaC coating container for UCx Target 
    Reply  Thursday, September 24, 2015, 12:18, John Wong, Empty, 41077-5, LP-SIS, Done, Sintering TaC coating container for UCx Target Screen_Shot_2015-09-24_at_11.51.11_AM.png420A_1900.pngTaC_coat_sintered.png
       Reply  Tuesday, October 06, 2015, 15:18, John Wong, Empty, 41077-5, LP-SIS, In progress, Test#1: Measuring temp with thermocouple (centre) & 2C-IR Temp_LPSIS_IR2C_vs_typeC.PNGTemp_LPSIS_IR2C_vs_typeC_heating_cooling.PNG
          Reply  Thursday, October 08, 2015, 12:26, John Wong, Empty, 41077-5, LP-SIS, In progress, Test#2: Measuring temp with thermocouple (away from centre) & 2C-IR Test_2_tempcurves.PNGTest1&2_IV_temp_.png
             Reply  Tuesday, December 01, 2015, 11:35, Anders Mjos, Empty, 41077-5, LP-SIS, In progress, Test#2: Measuring temp with thermocouple (away from centre) & 2C-IR 2015-10-08_Small_Centre_Block.xlsx2015-10-08.4ch2015-10-06.4ch2015-10-06_Small_Centre_Block.xlsx
Message ID: 265     Entry time: Tuesday, December 01, 2015, 11:35     In reply to: 252
Author: Anders Mjos 
Target Material: Empty 
Target Oven W.O#: 41077-5 
Source: LP-SIS 
Status: In progress 
Subject: Test#2: Measuring temp with thermocouple (away from centre) & 2C-IR 

 Data from thermocouple attached. Raw data and Excel sheet with plot.

Attachment 1: 2015-10-08_Small_Centre_Block.xlsx  1.921 MB
Attachment 2: 2015-10-08.4ch  3.651 MB  | Show | Hide all
Attachment 3: 2015-10-06.4ch  234 kB  | Show | Hide all
Attachment 4: 2015-10-06_Small_Centre_Block.xlsx  294 kB
ELOG V2.9.2-2455