Message ID: 589     Entry time: Thursday, August 25, 2022, 10:16
Author: Darwin Ortiz Rosales 
Target Material: TiC 
Target Oven W.O#: 44692-10 
Source: HP-FEBIAD 
Status: Done 
Subject: TiC 220818 Sintering (TiC #6) 

Thursday, August 25, 2022, 10:06

 

Target container is loaded with 379 Discs of TiC for Target and 5 extra discs for analysis on left end

Target length = 12.5

3 Ta foil heatshields and on TaC coated Ta spring on right side

Total weight including heatshields and spring = 1551.4 g   Final total weight = 1545.5 g

Final power should be ~10988 Watt

TGHT ramp up to 820A, and TGHT to 300A at 0.1A/min.

IGP1= 7.7e-7 Torr

Good vacuum =3.0e-05 Torr

Bad vacuum = 5e-04 Torr

Initial TGHT and TBHT autoramped @1A/min to 50A

TBHT mas 230A

TGHT max depends on final power

 


Thursday, August 25, 2022, 11:17 

Start autoramp at 1A/min to 80A on both TGHT and TBHT


Thursday, August 25, 2022, 11:54 

leaving at 80A until pressure stops rising

 


Thursday, August 25, 2022, 22:29

left to autoramp to 230A TBHT and 750 A TGHT since approximately 2:00 pm

Will leave ramping @1A/min to 750 A on TGHT

TBHT currently at 230A


 Friday, August 26, 2022, 07:27

TGHT = 850A, 9.3V

Started autoramp to 850A at 1A/min for TGHT

TBHT held at 230A

OMEGA = 1584C

 


Friday, August 26, 2022, 09:34

Target running at ~820A, 13.1 V since 9

Cooling to start between 1:15 to 1:30 pm

OMEGA reads 1668 C at top current

current reading oscillates between 812A and 828A and 13.1V  to 13.2V.

 


Monday, August 29, 2022, 12:21

Cooling at -2A/min for TGHT and -1A/min TBHT started on time on Friday August 26th.

Target remained under vacuum after cooling, over the weekend.

Target removed this morning and looks good. 5 discs removed for analysis

 