Message ID: 463     Entry time: Tuesday, October 08, 2019, 14:16
Author: Aaron Schmidt 
Target Material: SiC 
Target Oven W.O#:  
Source: HP-FEBIAD 
Status: In progress 
Subject: Temp measurements. 

Tuesday, October 08, 2019, 14:14: Remove Flex line HS. 

HS: 42752-1

Waterlines not open yet.

Tuesday, October 08, 2019, 14:15: roughing.

Tuesday, October 08, 2019, 14:24: Turbo pump on. 

Tuesday, October 08, 2019, 14:32: TP @ speed. 


Wednesday, October 09, 2019, 13:24 

The initial pressure was 3.25e-7 Torr

The current was manually increased to 25 A on both TBHT and TGHT  at a rate of 1 A each 30 s for both heaters.


Wednesday, October 09, 2019, 13:33

At 1 pm an additional ram was made to TGHT 350 A and TBHT 200 at same rate.