Message ID: 372     Entry time: Tuesday, May 30, 2017, 14:40
Author: Laura Lambert 
Target Material: Ta 
Target Oven W.O#: 42218-14 
Source: LP-SIS 
Status: Done 
Subject: Conditioning Ta#52 

 Tuesday, May 30, 2017, 14:36

Target consists of 400 discs.

Total packed length 2.9cm [exactly 8.05cm space on both sides]

Total mass 42.8228g [Incl foils + Ta wire on 4 packs]

Target consists of 320 single discs and 4x20 packs of Ta discs

Discs in target are arranged as follows: 80singles / 1pack / 80singles / 2packs / 80singles / 1pack / 80singles

3x Ta Heat shields.

No endcaps inserted, no Rh foil inserted.

Chamber currently pumping down.

TBHT will be ramped up to 230A at 1.0A/min.

TGHT will be ramped up to 350A at 2.0A/min.

Final desired temperature = 1900C

OMEGA slope = 0.98

Windows cleaned.

Vacuum limit stop at 3.0e-5 Torr, backing off at 4.0e-5 Torr.


 Wednesday, May 31, 2017, 09:47

HS water valves opened, no leaks detected.

Tapped up manually to 35A.

Vacuum stable.

IGP1 = 4.58e-7 Torr

IGP2 = 3.68e-7 Torr

Initiating auto ramp.


 Wednesday, May 31, 2017, 14:07

IGP1 = 1.11e-6 Torr

IGP2 = 1.13e-6 Torr

TGHT = 354A, 5.45V

TBHT =233A, 4.01V

OMEGA = 1565C

Increasing max setpoint to 400A at same ramping rate.


 Wednesday, May 31, 2017, 14:41

IGP1 = 1.19e-6 Torr

IGP2 = 1.24e-6 Torr

TGHT = 401A, 6.37V

OMEGA = 1708C

Increasing max setpoint to 425A at same ramping rate.


Wednesday, May 31, 2017, 15:51

Tapped up to ~1900C

TGHT = 480A, 7.85V

TBHT = 230A, 4.06V

OMEGA = 1912C

IGP1 = 1.85e-6 Torr

IGP2 = 2.06e-6 Torr

Will remain at max setpoints for a couple days before cooling


 Friday, June 02, 2017, 13:19

Remained at max setpoint for 2days

TGHT = 480A, 7.85V

TBHT = 230A, 4.06V

OMEGA = 1885C

IGP1 = 2.15e-7 Torr

IGP2 = 2.07e-7 Torr

Initiating auto-cool at 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.


 Monday, June 05, 2017, 15:18

Vented in air and taken out this morning.

Target looks good 


 Wednesday, June 07, 2017, 15:41

Endcaps inserted.

Ta heat shield removed.

Rh foil inserted.

Handed off to assembly.


 