Entry  Friday, October 07, 2016, 16:42, Laura Lambert, Ta, 41790-5, LP-SIS, In progress, Conditioning Ta#50 Ta#50_no_endcaps_3xh.s..xlsx
    Reply  Wednesday, October 12, 2016, 21:18, John Wong, Ta, 41790-5, LP-SIS, In progress, Conditioning Ta#50 
       Reply  Thursday, October 13, 2016, 17:32, Laura Lambert, Ta, 41790-5, LP-SIS, Done, Conditioning Ta#50 
Message ID: 330     Entry time: Thursday, October 13, 2016, 17:32     In reply to: 329
Author: Laura Lambert 
Target Material: Ta 
Target Oven W.O#: 41790-5 
Source: LP-SIS 
Status: Done 
Subject: Conditioning Ta#50 

John Wong wrote:

Laura Lambert wrote:

Friday, October 07, 2016, 16:40

Target consists of 470 discs.

Total packed length 3.4cm [exactly 7.8cm space on both sides]

Total mass g [Incl foils + Ta wire on 6 packs]

Note: Target consists of 350 single discs and 6x20 packs of Ta discs

3x Ta Heat shields.

No endcaps inserted, no Rh foil inserted.

Chamber currently pumping down.

TBHT will be ramped up to 230A at 1.0A/min.

TGHT will be ramped up to 300A at 2.0A/min.

Final desired temperature = 1900C


 Tuesday, October 11, 2016, 10:02
 
HS water valves opened, no leaks detected
 
Tapped up manually to 35A
 
Vacuum stable, IGP1 = 2e-7 Torr
 
Initiating auto-ramp.
 
OMEGA slope = 0.98

 Wednesday, October 12, 2016, 16:15

Tapped up to 1900C? [see attached link for data concerning temperature readings]

TGHT = 450A, 7.16V

TBHT = 230A, 4.1V

OMEGA = 1748C

IGP1 = 6.1e-7 Torr


 

 Wednesday, October 12, 2016, 21:14

Current status before cooling down:

TGHT at 450A/7.32V; TBHT at 230A/4.10V; OMEGA at 1747C

Vacuum at 4.05 e-7 Torr.

Initiate auto-rampping at 2A/min for TGHT and 1A/min for TBHT


 

 Thursday, October 13, 2016, 17:32

vented in air and opened up this morning.

target looks good.

ELOG V2.9.2-2455