Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Evaporator_2  Not logged in ELOG logo
Message ID: 537     Entry time: Tuesday, March 23, 2021, 08:07
Author: Aaron Schmidt 
Target Material:  
Target Oven W.O#:  
Source:  
Status:  
Subject: Re - Ta test. Leak check. 

 Modified HS installed with new brackets as per Marla.

Tuesday, March 23, 2021, 08:02: Vacuum @ 3.64e-07T. Waterlines opened.

Tuesday, March 23, 2021, 08:06: Vacuum @ 3.60e-07T. Stable.

ELOG V2.9.2-2455