Message ID: 606     Entry time: Friday, December 02, 2022, 09:50
Author: Darwin Ortiz Rosales 
Target Material:  
Target Oven W.O#: 45220-12 
Source: TARGET BOAT 
Status: Done 
Subject: Grahite disc conditioning 221130-Graphite 

Friday, December 02, 2022, 09:46

297 graphite discs packed into a Ta tube wrapped in four heatshields.

Good vacuum 5.0e-04 Torr

Bad vacuum 5.0 e-02 Torr

Will be conditioned @ 2000 C for 5 hours and then for one hour at 10A greater than final current.  Final current will be calculated from

regression.

 IGP1= 5.7 e-07 Torr

ramping to 40A @ 2A/min TGHT


Friday, December 02, 2022, 20:59

Was ramped to 320A but the window must be coated because Temperature readings are drastically off. Will cool down and repeat on Monday after cleaning window.  Will ramp down at -2A/min

OMEGA= 1360 C, expect much higher.


Tuesday, December 06, 2022, 10:58

ramp started at 4A/min .  Initial pressure was 2.6 e-07 Torr


Tuesday, December 06, 2022, 12:45

OMEGA readings low (1290 @ 331A, 5.6V )

Will tap up until pressure bump observed.


Tuesday, December 06, 2022, 13:04

 Pressure bump observed around 440 A, 7.9 V

IGP1= 8.4 e-06 Torr. 

Current stopped and will keep at this current for 10 hours (11 pm rampdown)


Tuesday, December 06, 2022, 13:24

Ramped to 500A, Will leave at 500A for the rest of the conditioning.

 


Tuesday, December 06, 2022, 23:05

Starting rampdown at -2A/min

IGP1= 4.9e-07 Torr

TGHT= 500A, 9.3V

 


Wednesday, December 07, 2022, 09:43

Dismounting today.

IGP1 final = 9.6e-08 Torr


Wednesday, December 07, 2022, 13:29

Reinstalled in the evaporator.  Window was not shaded.  Will try heating to 500A once more.

ramp at 6A/min