Thursday, January 30, 2025, 09:17
Left to pump down on previous night
The coated container was wrapped in 4 Ta foil heatshields.
Vacuum IGP1 initial =8.1 e-06 Torr
Target temperature on OMEGA= 1850-1900 C
OMEGA slope:= 0.990
Target time at max temperature = 4 hours
Final Current TBHT= 230 A
Final TGHT current= ~500A (adjustable)
Heating autoramp starged at 0.5A/min(1A/120s) to 60A on both TGHT and TBHT
Then at 0.5A/min to 90 A, both TGHT and 230A TBHT
When pressure stable will ramp at 2A/min to ~500A on TGHT and 230A on TBHT
Good vacuum = 5.0 e-04 Torr
Bad vacuum = 5.0E-02 Torr
Thursday, January 30, 2025, 09:20
currently ramping to 90A
Thursday, January 30, 2025, 12:30
Ramping to 120A @ 0.5 A/min
Thursday, January 30, 2025, 13:59
Ramping to 140 A at 1A/min (to check pressure change. So far with slower heating, pressure has not spiked very high).
Thursday, January 30, 2025, 15:59
Started ramping @ 2A/30s to 500 A on TGHT
TBHT is at 230A
Thursday, January 30, 2025, 21:25
Target was sintered when OMEGA reading 1700-1750 C
At 640-660A on TGHT RD
Check target coating and repeat these setting if good.
Thursday, January 30, 2025, 21:43
Cooling started at -2A/min on TGHT and -1A/min TBHT
|