  RH-Meson Hall, all entries  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
  IDdown Date Author Category Type Specific Subject Text Attachments
  358   Friday, January 10, 2025, 18:36 Albert KongStandard OperationOtherCoolingT1/T2 cooling packages drainedThe T1 and T2 cooling packages were drained
starting at 14:36, by 14:48 both expansion
tanks had dried, meaning the draining rate
 CALCS_T1_T2_cooling_system_drain_speed.htmlTritium_Sample_and_Analysis_Form_-_T1_Cooling_Package_-_2025-01-10.pdfTritium_Sample_and_Analysis_Form_-_T2_Cooling_Package_-_2025-01-10.pdf 
  357   Friday, November 29, 2024, 11:57 Adam NewsomeMaintenanceOtherHot CellHot cell and warm cell maintenance tasksThe following maintenance tasks were completed
on 2024-11-29 by A. Newsome, A. Kong, A.
Tam, M. Dalla Valle:
 Operator_left_oil_level_before_refill.jpgOperator_Left_oil_level_after_refill.JPGOperator_right_oil_level.jpgRight_window_water_level_before_refill.jpgWarm_cell_water_window_after_refill.jpg 
  356   Wednesday, October 30, 2024, 15:10 Albert KongStandard OperationTarget 1TargetT1-MK1 Electrical Check on Hot CellT1-MK1 electrical checks were completed
on the hot cell. Specifically the profile
and protect monitors were checked (assistance
 7x 
  355   Thursday, October 10, 2024, 12:24 Adam NewsomeOtherOtherHot CellSafety Walkaround Complete - Meson Hall HC/WC AreaA safety walkaround was completed for the
Meson Hall Hot/Warm Cells. 
The resulting spreadsheet can be
  
  354   Monday, September 09, 2024, 16:31 Albert KongStandard OperationOtherActive SumpActive Sump High Level Sensor TestingThe active sump high level sensor was tested
and correctly alarmed locally. However the
alarm in the MHESA RCR lab did not make any
  
  353   Monday, September 09, 2024, 09:39 Albert KongOtherTarget 2Cooling B1A:T2CS:FGSEC:RDFLOW noisy, CYCLOTRON Fault 17321Secondary flow sensor B1A:T2CS:FGSEC:RDFLOW
on the T2 cooling station suddenly became
very noisy at around 11 pm, 01 September
 EPICS_Data_Strip.png 
  352   Thursday, August 22, 2024, 15:16 Adam NewsomeStandard OperationOtherActive SumpActive sump filled ~600L with grey water from RCR1 sump replacementDuring a replacement  of the RCR1 active
sump (mechanical services group), approximately
600L of non-active grey water was released
  
  351   Tuesday, August 06, 2024, 11:35 Albert KongStandard OperationOtherBL1A Holding TankBL1A and RH Active Sump DrainingThe RH active sump was drained (over Jul
31-Aug 01), in total approximately 5500 L
of water was sent to city sewage.
 IMG_0173.JPEGIMG_0170.JPEGIMG_0185.JPEG 
  350   Wednesday, July 17, 2024, 15:05 Adam NewsomeStandard OperationOtherOtherSafety Walkaround Complete - Meson Hall HC/WC AreaA safety walkaround for July 2024 was completed
by A. Kong.
Results can be found in the master
  
  349   Friday, June 28, 2024, 15:44 Albert KongOtherOtherTransfer FlaskInspection of Primary Target Transfer Flask





Normal
0
 Flask_Inspection_Images_(26_June_2024).pdf 
  348   Thursday, May 23, 2024, 17:10 Albert KongStandard OperationTarget 1TargetT1-MK1 Target Exchange (+ leak fix, service panel changes, coupler exchange)On May 23, 2024 two sets of plugs from
position 1 and 3 and a 12mm Be target from
position 5 (serial #109) was removed from
 36x 
  347   Tuesday, May 07, 2024, 13:21 Albert KongRepairTarget 2CoolingT2 Cooling System Expansion Tank Ultrasonic Level Sensor RepairAt ~8am on May 06, the expansion tank level
sensor for the T2 cooling system suddenly
became noisy. 
 T2_Level_EPICS_Readout.pdfT2_expansion_tank_sensor_noise_issue_-_4_hr_after_fix.PNG 
  346   Wednesday, April 03, 2024, 10:48 Adam NewsomeOtherOtherBL1A Holding TankBL1A Holding Tank - water level checkAs of 2024-04-03, the BL1A Holding Tank
water level is approximately 580L. It is
recommended to drain the tank prior to the
  
  345   Thursday, February 15, 2024, 14:53 Albert KongMaintenanceTarget 2Air amplifiersT2 Lower Air Amplifier Maintenance/RebuildThe lower amplifier for the T2 target station
air supply was removed for teardown, inspection,
and rebuild. 
 IMG_4005.JPEGIMG_4006.JPEGIMG_4054.JPEG 
  344   Thursday, February 15, 2024, 12:38 Riley SykesRepairOtherHot CellIndium Extruder Hand PumpFeb 1 2024
Hand Pump observed to be losing pressure
at full extension of cylinder, seals likely
  
  343   Thursday, February 01, 2024, 11:16 Albert KongStandard OperationOtherCoolingSpent resin can rinse, purge, and drying The recently removed resin can from
the T2 target station was rinsed with city
water and flushed with compressed air for
  
  342   Thursday, February 01, 2024, 11:14 Albert KongStandard OperationTarget 1Hot CellT1-MK1 Flush and Purge on Hot CellThe recently removed T1-MK1 target ladder
was flushed with city water for ~30s at all
target positions. It was then purged with
 IMG_3950.JPEGIMG_3975.JPEGIMG_3973.JPEGIMG_3971.JPEGT1&T2_Pump-Down_and_Leak_Check_Record_05_FEB_2024.pdf 
  341   Friday, January 19, 2024, 17:07 Albert KongStandard OperationOtherTargetT1/T2 Profile Monitor, TGT Ladder, CUNO filter leak, Motor Coupling Inspection, + M9/M20 Blocker Actuation The following tasks were completed:

    Yesterday (Jan 18), the
T1/T2 cooling packages were inspected for
 7x 
  340   Monday, January 15, 2024, 16:47 Albert KongStandard OperationOtherCoolingT1/T2 Cooling Pkg. Prep for Refill + Leak Check At Pressure The following tasks were completed
in preparation of re-filling the T1 and T2
cooling packages:
 7x 
  339   Monday, January 15, 2024, 16:36 Albert KongStandard OperationTarget 2CoolingT2 Resin Flask ExchangeThe resin flask on the T2 cooling package
was exchanged today (new resin can prepped
in the morning). 
 IMG_3836.JPEGIMG_3844.JPEGIMG_3856.JPEG 
  338   Thursday, January 11, 2024, 15:10 Albert KongMaintenanceOtherCoolingT1/T2 Cooling Pkg. Proteus Paddle Wheel Maintenance, CUNO Filter Replacement, and Fitting Inspection The following tasks were performed:

    All electrical, water,
and pneumatic connections to the T1 target
  
  337   Wednesday, January 10, 2024, 12:47 Albert KongStandard OperationTarget 1TargetT1 target ladder exchange (T1-MK1 to hot cell roof, T1-MK2 from pit to station)T1-MK1 was moved from the target station
to the hot cell roof. 
Radiation surveys report 140 mSv/hr
 T1_and_T2_Beryllium_Target_Beamtime_Spreadsheet_-_(10Jan2024).xlsxMeson_Hall_Storage_Pit_Target_Device_Location_Record_-_(10Jan2024).pptmVacuumAt2.56PM.PNG 
  336   Wednesday, January 10, 2024, 12:25 Albert KongStandard OperationOtherCoolingT1/T2 cooling packages drainedJan 10, 2024:
The cooling packages for T1/T2 was
drained this morning. ~150 L from each of
 T1T2EPICSPages.PNGIMG_3943.JPEGIMG_4231.JPEG 
  335   Monday, December 04, 2023, 09:22 Albert KongStandard OperationTarget 2CoolingT2 TGT Low Flow See Cyclotron fault 16553. 
"B1A:T2CS:FGTGT readback is
toggling at the warn limit of 3.0 GPM and
 T2FlowAlwaysCloseTo3GPM.pngT2TGTWaterTempOK.pngWarnTripLevels.pngFlowWarnTripLevels.pngPicture1.png 
  334   Tuesday, October 17, 2023, 14:25 Albert KongMaintenanceOtherOtherT1/T2 Air Amplifier Spool O-Ring ServicingToday we re-lubricated the o-rings on the
top air amplifier for T1/T2, and replaced
the o-rings on the bottom air amplifier with
 IMG_2576.JPEGIMG_2575.JPEG 
  333   Tuesday, October 17, 2023, 10:16 Eric LaheMaintenanceOtherActive SumpTesting the Remote Handling Lab Active Sump Level SensorThe level sensor for the active sump in
the RH lab was tested.
The level sensor is working properly
  
  332   Thursday, August 03, 2023, 10:33 Albert KongRepairTarget 2CoolingT2 Expansion Tank Water Level Low (Leak Identified)The water level in the T2 cooling system
expansion tank dropped to below the trip
treshold of 20 cm (ref Cyclotron fault #16123),
 7x 
  331   Tuesday, July 18, 2023, 09:14 Adam NewsomeOtherTarget 1CoolingT1 Cooling Package: target flow (FGTGT) sensor noise issuesBetween 1:00 pm and 6:00 pm on July 17,
2023, the T1 target cooling water flow rate
sensor exhibited some noise which resulted
 1.PNG2.PNG 
  330   Tuesday, June 06, 2023, 15:42 Albert KongStandard OperationTarget 1CoolingT1 Heat Exchanger Low Flow DiagnosticsOn May 31, the low active water in BL1A
was turned off briefly and upon re-starting,
the flow to the T1 heat exchanger was very
 Picture1.pngPicture2.png 
  329   Thursday, May 11, 2023, 11:28 Adam NewsomeRepairTarget 1TargetT1-MK1 - broken target ladder motor coupler repairedSee Cyclotron Fault 15787. The target ladder
motor failed to move to the commanded position
during a test. The T1 area was uncovered
  
  328   Wednesday, May 03, 2023, 10:06 Adam NewsomeMaintenanceOtherHot CellMeson Hall Hot Cell - Nuclear Ventilation HEPA Filter Changed, OperationalThe HEPA filter in the nuclear ventilation
system for the Meson Hall Hot Cell was changed
and tested by mechanical services under work
  
  327   Thursday, April 06, 2023, 13:35 Albert KongMaintenanceTarget 1ControlsT1 Motor Controller Hearbeat Trip (+T2 Heartbeat Trip)The T1 motor controller hearbeat tripped
(noticed this morning). 
This does not seem prevent beam delivery
 MotorControllerHB.pngScreenshot_2023-04-11_145420.png0367549f-9672-4009-be34-df7abacf4a32.jpgScreenshot_2023-05-16_091027.png 
  326   Thursday, March 30, 2023, 13:17 Albert KongMaintenanceOtherTargetAir Amplifier Testing: M9 BB (AKA T2 blocker), M20 BB, T2 MK1 prof. monitor, T1 MK1 prof. monitor actuationWe tested the air amplifiers by actuating
the beam blockers and profile monitors on
the T1 and T2 target stations. 
 T1_Mar30_2023_Vacuum.pngT2_Mar30_2023_Vacuum.pngIMG_1907.JPEG 
  325   Wednesday, March 15, 2023, 15:56 Albert KongMaintenanceTarget 2ControlsT2 - M9 and M20 beam blocker actuation and vacuum test We tested the actuation of the M9/M20
beam blockers on the T2 monolith (3-4pm).
Vacuum levels remained steady throughout
 6x 
  324   Monday, March 06, 2023, 16:58 Albert KongRepairTarget 2CoolingM20 O-Ring Replacement and Valve Replacement Leak Check We replaced tha O-ring on M20 at
T2 and brought the target station down to
vacuum, which allowed the target water pump
 T1_Mar06_2023.pngT2_Mar06_2023.png 
  323   Friday, March 03, 2023, 16:00 Albert KongMaintenanceTarget 2OtherM20 Return to T2 Monolith + Vaccum Leak / T1-T2 Valve Re-inspection We moved M20 back to the T2 monolith
and re did the connections for air + limit
switches + T2 profile monitor air.
 IMG_1755.JPEGIMG_1657.JPEGIMG_1763.jpegScreenshot_2023-03-30_124716.png 
  322   Thursday, March 02, 2023, 07:04 maicodallavalleMaintenanceTarget 2CoolingRefilled Expasion TankI have filled the water package on T2 with
DI water. The expansion tank is at 38.1cm.
This may change when the pump is turned on.
  
  321   Thursday, March 02, 2023, 06:59 maicodallavalleMaintenanceTarget 1CoolingRefilled Expasion TankI have refilled the water package on T1
with DI water. The Expansion Tank is at 37cm.
This may change when pump is turned on.
  
  320   Wednesday, March 01, 2023, 13:10 Albert KongMaintenanceOtherCoolingT1/T2 Water Cooling Package Heat Exchanger Ball Valve Replacement3x 3/4" swagelok ball valves (2x at
T2 and 1x at T1) were replaced after the
water cooling line was shut off at the BL1A
 IMG_1452.JPEGIMG_1431.JPEGIMG_1438.JPEGIMG_1455.JPEG 
  319   Tuesday, February 21, 2023, 16:56 Albert KongMaintenanceTarget 2OtherM20 BB moved to meson hall hot cell roofThe M20 beam blocker was moved from the
T2 monolith to the meson hall hot cell with
the remote handling flask (completed ~4pm).
 IMG_1255.JPEG 
  318   Friday, February 17, 2023, 14:36 Albert KongRepairOtherWater LeakT1/T2 Water Cooling Package Ball Valve Replacement5 and 3 Swagelok ball valves were replaced
from the T1 and T2 cooling packages respectively.
These are compression fit valves,
 fdb0d111-3348-483d-a78f-98eabbc45507.jpg 
  317   Thursday, February 02, 2023, 15:14 Albert KongMaintenanceTarget 1CoolingT1 Cooling Package: Leaked Valve InspectionA 0.75" SwageLok ball valve that was
taken out from the T1 cooling package was
inspected (SS-45S12).
 CompiledPictures.pdf 
  316   Thursday, February 02, 2023, 10:35 Albert KongMaintenanceTarget 1CoolingT1 Cooling Package Draining (Prep for Valve Replacement)Water reservoir in T1 started draining
at ~7.30 am, will leave till tomorrow or
overnight to fully drain. 
  
  315   Wednesday, February 01, 2023, 14:23 Albert KongMaintenanceTarget 1CoolingT1 Cooling Package: flow test after resin exchange / valve leak check / faulty(?) dial pressure gauge Maico/Eric/Albert:
The expansion tank in T1 was filled
to ~36cm in the morning.
 IMG_1038.JPEG 
  314   Tuesday, January 17, 2023, 13:49 Adam NewsomeRepairOtherActive SumpActive Sump - Valve V6 LeakingIt was noticed today (2023-01-17) that
the valve V6, used in draining the BL1A Holding
Tank to the Active Sump, was leaky. This
  
  313   Tuesday, January 17, 2023, 13:46 Adam NewsomeMaintenanceOtherActive SumpFilter Change: RH Active Sump and BL1A Holding Tank Drain OutputThe CUNO filters were changed 2023-01-17
for:

    BL1A Holding Tank drain
 PXL_20230117_195113855.MP.jpgPXL_20230117_195649596.jpg 
  312   Monday, January 16, 2023, 15:06 Adam NewsomeRepairOtherActive SumpRH Active Sump - draining flow rate sensor repairThe flow rate sensor used to monitor the
drain rate from BL1A holding tank to active
sump, located in the active sump area, was
  
  311   Monday, January 16, 2023, 15:04 Adam NewsomeMaintenanceTarget 2CoolingT2 Cooling Package MRO - 2023 ShutdownT2 Cooling Package MRO began Jan. 16, 2023.
 
The following maintenance tasks have
 T2_FGSEC_old_vs_new_paddle.jpgT2_2023-03-07.PNG 
  310   Monday, January 16, 2023, 15:01 Adam NewsomeMaintenanceTarget 1CoolingT1 Cooling Package MRO - 2023 ShutdownT1 Cooling Package MRO began Jan. 16, 2023.
 
The following maintenance tasks have
 T1_2023-03-06.PNG 
  309   Monday, January 16, 2023, 09:54 Adam NewsomeStandard OperationOtherCoolingT1 and T2 - Cooling Package DrainedOn Jan. 13, the T1 and T2 cooling package
water reservoirs were drained to the BL1A
holding tank. Water samples were obtained
  
  308   Thursday, January 12, 2023, 10:36 Adam NewsomeMaintenanceTarget 1Water LeakT1 and T2 - Cooling Package Water Leaks - Ball ValvesUpon uncovering the T1 and T2 areas to
prepare for regular cooling package maintenance,
it was discovered that multiple ball valves
 PXL_20230111_204027523.jpg 
  307   Wednesday, January 11, 2023, 15:22 Adam NewsomeRepairTarget 2TargetT2 Target Ladder Motor - Coupling FailureIt was reported on Dec. 20, 2022 that when
Operations attempted to run the target ladder
motor, it was unresponsive. A fault report
 PXL_20230111_214957143.jpgPXL_20230111_215006211.jpgNew_Coupler_-_T2_Target_Ladder_Motor.PNG 
  306   Tuesday, January 03, 2023, 07:42 Adam NewsomeOtherOtherActive SumpActive Sump - Level CheckThe sump level was checked by Robin Swanson
on Dec. 31, 2022. It was essentially empty
- see attached photo.
 2022-12-31.jpg 
  305   Tuesday, October 11, 2022, 11:27 Adam NewsomeMaintenanceTarget 1CoolingT1 inlet pressure transducer replacementA fault was reported June 21, 2022 (Fault
15033) regarding T1 inlet pressure warnings...
 T1_inlet_pressure.png 
  304   Tuesday, October 04, 2022, 09:59 Adam NewsomeMaintenanceTarget 2CoolingT2 cooling package maintenance - mini-shutdown 2022The following maintenance tasks were performed
during mini-shutdown of 2022 with the goal
of resolving the Fault 14966 (target water
  
  303   Friday, September 23, 2022, 10:51 Matthew GareauStandard OperationTarget 2TargetTarget T2-MK2 moved to storage pitThe T2-MK2 target was transported from
the east hot cell to the storage pit at position
3.
 Storage_location_state_as_of_Sept_23_2022_(after_target_moves).jpg 
  302   Thursday, September 15, 2022, 14:34 Adam NewsomeStandard OperationTarget 2TargetT2-MK2 target elevations measurementThe target elevations measurement and beam
spot checks were completed on Sept. 15, 2022.
This was done after a July 2022 target exchange
 T2-MK2_-_Sept_2022.pdf 
  301   Tuesday, August 30, 2022, 14:24 Adam NewsomeMaintenanceOtherHot CellNuclear Ventilation - Filter ChangeMechanical Services Group changed the pre-filter
in the ventilation system on Aug. 29, 2022
as per work permit C2022-08-29-2.
  
  300   Tuesday, August 23, 2022, 14:36 Adam NewsomeStandard OperationOtherOtherBL1A Holding Tank - Level CheckThe water level inside the BL1A active
water holding tank was checked today (Aug.
23, 2022). The tank is essentially empty
  
  299   Monday, August 22, 2022, 09:01 Adam NewsomeStandard OperationOtherActive SumpActive Sump DrainingOn Aug. 18, 2022, Operations informed RH
group that an alarm activated for the full
status of the MHESA B1 RCR1 Lab holding tank.
  
  298   Thursday, July 28, 2022, 12:51 Adam NewsomeRepairOtherHot CellMeson Hall Hot Cell - Nuclear Ventilation IssueIt was reported today by Peter Bratt that
the nuclear ventilation system for the hot
cell is not functioning. At this time, the
  
  297   Wednesday, July 06, 2022, 12:52 Adam NewsomeOtherOtherHot CellPotential hot cell window oil leakSome oil was noticed around the hot cell
window, on the control panel, and on the
ground below the control panel. A leak is
  
  296   Wednesday, July 06, 2022, 12:49 Adam NewsomeRepairOtherHot CellHot Cell - Helium wand tubing brokenThe tubing for the helium wand inside the
hot cell is broken and needs to be replaced.
More tubing has been ordered and the job
  
  295   Wednesday, July 06, 2022, 12:49 Matthew GareauRepairOtherOtherHelium line damage, and hotcell window oil leakingToday myself and Adam Newsome started the
leak detection steps for a target exchange
and notice that the Helium line was not connected/broken
  
  294   Wednesday, June 08, 2022, 08:59 Adam NewsomeOtherTarget 2CoolingT2 flow rate sensor (BL1A:T2CS:FGTGT ) - warning and trip limits adjustedSee fault 14966: 





Normal
0
 After_Adjustment.PNGSensor_data_around_June_6-8.PNG 
  293   Wednesday, May 25, 2022, 10:16 Adam NewsomeStandard OperationTarget 2TargetT2-MK2 moved: from storage location to hot cellTarget T2-MK2 was moved from the storage
location (formerly position 3) to the hot
cell in preparation for replacement of end
  
  292   Wednesday, May 25, 2022, 10:15 Adam NewsomeStandard OperationTarget 1TargetT1-MK2 moved from hot cell to storage areaThe T1-MK2 target was moved from the hot
cell to the storage area, in position 5.
Note: manual nudging of the flask was required
  
  291   Thursday, May 05, 2022, 14:39 Adam NewsomeStandard OperationTarget 1TargetT1-MK1 and T2-MK1 profile monitor actuation testThe profile monitor actuation tests were
completed for T1 and T2. No abnormalities
were noticed in vacuum during either test.
  
  290   Thursday, May 05, 2022, 14:38 Adam NewsomeMaintenanceTarget 2ControlsT2-MK1: profile monitor actuation check and repair to connectorAn attempt was made to actuation the T2
profile monitor, however it showed up in
EPICS as being not present. Furthermore,
 T2-MK1_prof_mon_connector_-_rear_-_after_fix.jpg 
  289   Wednesday, May 04, 2022, 11:27 Adam NewsomeStandard OperationTarget 2M9M9 and M20 Beam Blocker Actuation TestThe beam blockers for M9 and M20 were actuated,
and vacuum was monitored to ensure no disruptions.
Both actuation tests were successful. Motion
  
  288   Thursday, April 14, 2022, 14:38 Adam NewsomeOtherTarget 2DiagnosticsIssue with Protect Monitor SHV CableDiagnostics group (Shengli Liu) noted a
lack of connectivity between control panel
and T2 Protect Monitor via the high voltage
 PXL_20220414_210238000.jpgPXL_20220414_210053641.jpgPXL_20220414_210037717.jpg 
  287   Wednesday, April 13, 2022, 12:33 Adam NewsomeStandard OperationTarget 2TargetT2-MK1 moved: from storage area to target stationThe T2-MK1 target was moved from the storage
area (formerly position 4) to the target
station. Services were reconnected in order
  
  286   Wednesday, April 13, 2022, 12:31 Adam NewsomeStandard OperationTarget 2TargetT2-MK2 moved: from target station to storageThe T2-MK2 target was moved from the target
station to the storage area (position 3).
Upon removal, it was measured with a pole
  
  285   Wednesday, March 16, 2022, 14:16 Matthew GareauStandard OperationOtherCoolingT1/T2 water packages drained to B1A AWHT, tested, and released. Also solenoid valve SV1 broken The T1/T2 water packages were drained
into the B1AAWHT (280L), the water was sampled
and tested by RPG, results included in elog.
 11_Mar_2022_Tritium_Records_T1_T2_from_RPG.pdfsolenoid_valve_SV1.jpg 
  284   Monday, March 14, 2022, 14:09 Adam NewsomeMaintenanceTarget 2Cooling T2 cooling system: filled, tuned, leak-checked The T2 cooling system was refilled with
water via the expansion tank until the tank
level read approximately 38 cm. 
  
  283   Monday, March 14, 2022, 14:08 Adam NewsomeMaintenanceTarget 1CoolingT1 cooling system: filled, tuned, leak-checkedThe T1 cooling system was refilled with
water via the expansion tank until the tank
level read approximately 38 cm.
  
  282   Friday, March 11, 2022, 15:09 Adam NewsomeMaintenanceTarget 2CoolingFilters replaced: T2 cooling systemAll filters were replaced for the T2 cooling
system: demineralizing resin circuit and
target water system. 
  
  281   Friday, March 11, 2022, 15:08 Adam NewsomeMaintenanceTarget 1CoolingFilters replaced: T1 cooling systemAll filters were replaced for the T1 cooling
system: demineralizing resin circuit, target
water system, and M15. 
  
  280   Friday, March 11, 2022, 15:06 Adam NewsomeMaintenanceTarget 2CoolingO-rings on T2 cooling package water reservoir changedThe four o-rings on top of the T2 cooling
package water reservoir were  changed as
per the recommended 5 year replacement schedule.
  
  279   Friday, March 11, 2022, 15:05 Adam NewsomeMaintenanceTarget 1CoolingO-rings on T1 cooling package water reservoir changedThe four o-rings on top of the T1 cooling
package water reservoir were changed as per
the recommended 5 year replacement schedule.
  
  278   Thursday, March 10, 2022, 13:57 Adam NewsomeMaintenanceTarget 1CoolingChanged paddle wheel, o-ring, and shaft in flow sensors at T1 cooling packageThe paddle wheels, o-rings, and shafts
were changed at the T1 cooling package for
the following sensors:
  
  277   Thursday, March 10, 2022, 11:18 Adam NewsomeMaintenanceTarget 2CoolingChanged paddle wheel, o-ring, and shaft in flow sensors at T2 cooling packageThe paddle wheels, o-rings, and shafts
were changed at the T2 cooling package for
the following sensors:
 PXL_20220310_173802512.jpgPXL_20220310_173759444.jpg 
  276   Thursday, February 17, 2022, 13:03 Matthew GareauMaintenanceTarget 1TargetT1 MK2 wire scanner and protect monitor test removal and reattachment with pin straightening this Work was done on 09 Dec 2021.
Since Isaac Earle was leaving Triumf
he was giving us (maico, chad, adam, and
 IMG_20211207_140443.jpgIMG_20211207_140508.jpgIMG_20211207_140735.jpgIMG_20211207_122631.jpgIMG_20211207_142836.jpg 
  275   Wednesday, April 14, 2021, 14:30 Isaac EarleStandard OperationOtherActive SumpRH Lab Active Sump pumped out The RH Lab Active Sump reached the
high level sensor at some point overnight
before the April 8th work day.  Maico
  
  274   Friday, April 09, 2021, 12:42 Matthew GareauMaintenanceTarget 2CoolingChanged the paddle wheel, o ring, and shaft in the Collimator A flow meter at the T2 packageWith the assistance of Maico we changed
the paddle wheel, o ring, and shaft in the
Collimator A flow meter (Q4) at the T2 package.
  
  273   Wednesday, March 31, 2021, 16:15 Matthew GareauStandard OperationTarget 1TargetT1-MK1 target exchange March 29 Monday
- moved T1-MK1 target from beamline
to hotcell  (field from target 15mSv/hr
 IMG_20210330_140744.jpgIMG_20210330_141059.jpgIMG_20210330_141455.jpgT1-MK1_-_2021.pdf 
  272   Wednesday, February 17, 2021, 10:39 Isaac EarleDevelopmentOtherUCNUCN Target Cask TestingA trial run of remote removal of the UCN
target was performed using the shielded target
cask (TTA0335) developed in 2020.  The
 8x 
  271   Tuesday, November 24, 2020, 15:10 Isaac EarleStandard OperationTarget 2TargetAdditional targets added to T2-MK1 ladder The following work on the T2-MK1
target was completed sporadically over the
last few months:
  
  270   Tuesday, October 27, 2020, 14:01 Isaac EarleRepairTarget 2CoolingT2 Collimator flow meter paddle wheel replacedThe T2 Collimator A flow meter signal (B1A:T2:FGCOLA)
began fluctuating and occasionally reading
0gpm on Sunday Oct 25 causing BL1A trips
  
  269   Wednesday, August 19, 2020, 12:57 Isaac EarleMaintenanceTarget 1CoolingT1/T2 MRO summary for 2020 shutdownThe following work was completed during
the 2020 shutdown period for BL1A (Jan-Aug
2020):
  
  268   Thursday, July 09, 2020, 06:44 Isaac EarleDevelopmentOtherM9Alignment of M9 Q1Q2 magnets complete Mike Vogel reported that alignment
of the Q1Q2 assembly w.r.t. the T2 and B1
flanges was completed on July 7.  This
  
  267   Tuesday, July 07, 2020, 15:13 Isaac EarleDevelopmentOtherM9M9 Q1Q2 service stand Lemo connector wiringThe diagram below shows the wiring for
the two connectors on the service stand (the
wires running from the stand to the power
 Lemo_pin_wiring.PNG 
  266   Tuesday, July 07, 2020, 13:22 Isaac EarleDevelopmentOtherM9M9 Q1Q2 The M9 Q1Q2 magnet assembly lift
beam has been installed according to drawing
TB23401.  The side-to-side as well as
 8.jpg1.jpg4.jpg6.jpg 
  265   Friday, June 12, 2020, 13:54 Isaac EarleDevelopmentOtherM9M9 Q1Q2 water header installedThe Q1Q2 water header (TB23481) was mounted
this morning as per installation drawing
TB23400.
 2.jpg1.jpg 
  264   Wednesday, June 10, 2020, 08:58 Isaac EarleDevelopmentOtherM9T2-M9 and M9-B1 flange scan data Laser tracker scan data from 2017
and 2019 attached as a backup.  Original
files from Beamlines Group who also keep
 2017-03-28_meson_hall_t2_with_import_of_2015_data.xit642019-25-01_meson_hall_t2_data.xit64 
  263   Tuesday, June 09, 2020, 17:01 Isaac EarleDevelopmentOtherM9Cables and helium leak check line installed to M9 service stand The 10-pin thermal switch wire, 2-pin
steering wire for Q2, and a 1/4" copper
tube for remote helium leak check were installed
  
  262   Monday, April 06, 2020, 15:02 Isaac EarleStandard OperationTarget 2M9M9 beam blocker returned to beamlineThe M9 beam blocker was returned to the
beamline today using the RH shielded transport
flask.  The top flange o-ring was replaced
  
  261   Monday, March 23, 2020, 16:13 Isaac EarleMaintenanceOtherOtherM9 beam blocker MRO completedM9 beam blocker MRO work was completed
in the hot cell today.  This included
replacement of the main shaft seals and replacement
  
  260   Wednesday, March 11, 2020, 10:29 Isaac EarleDevelopmentOtherM9M9 Q1Q2 service stand foot plate installed The M9 Q1Q2 "foot" plate
(TB23363) has been installed over the floor
plate.  A nominal gap between the plates
  
  259   Wednesday, March 04, 2020, 13:42 Ron KuramotoRepairOtherOtherB/L 1A vacuum air leak repair A 4” Marmon aluminum blank-off
flange and o-ring were replaced on the south
port of the T1 target monolith vacuum vessel. This
 1AT1_Vacuum_Leak_Repair-Feb2020.pdf 
  258   Friday, February 28, 2020, 09:06 Isaac EarleDevelopmentOtherM9M9 Q1Q2 service stand floor plate installed The M9 service stand floor plate
(TB23351) was installed in the M9 pit yesterday. 
Prior to installation all 5 threaded inserts
 M9_service_stand_floor_plate_TB23351.png 
  257   Monday, February 10, 2020, 14:51 Isaac EarleMaintenanceOtherOtherT1-MK2 target and M9BB moved The T1-MK2 target was moved from
the hot cell to Hole #5 in the storage pit. 
The M9 beam blocker was then moved from the
  
  256   Wednesday, February 05, 2020, 14:53 Isaac EarleMaintenanceTarget 1CoolingT1 & T2 cooling package MRO work completed Annual MRO work on the T1 and T2
cooling packages is now complete.  The
following tasks were performed:
  
  255   Thursday, January 30, 2020, 17:55 Isaac EarleRepairTarget 1TargetT1-MK2 target assembly repair completed in hot cellThe following work was done to the T1-MK2
target in the hotcell between the dates of
May 24, 2019 - Jan 30, 2020 (See E-Log #251
 T1-MK2_-_2020.pdfRHB_8901_Position_1_Entrance_Window.jpgDSC_0047_Position_1_Exit_Window.jpgRHB_8904_Position_4_Entrance_Window.jpgDSC_0022_Position_4_Exit_Window.jpg 
  254   Monday, January 20, 2020, 16:07 Isaac EarleOtherOtherOtherSecond 55-gal drum moved to cyclotron east vault tunnel The second (and final) 55 gallon
drum containing active items from the Meson
Hall East Hot Cell was transported today
 RWC-55-02-2019_(after_move_to_cyc_vault_tunnel).pdf 
  253   Tuesday, December 17, 2019, 12:39 Isaac EarleStandard OperationOtherOther55 gallon drum and old M9 service stand moved to Rad Waste PitThe following items were moved today from
the Warm Cell to the Rad Waste Pit for long
term storage:
 RWC-55-01-2019.pdfpit_-_before_move.jpgdrum_being_lifted.jpgpit_-_after_move_-_showing_drum.jpgpit_-_after_move_-_showing_service_stand_(bottom_right_with_green_sling).jpg 
  252   Monday, June 24, 2019, 14:29 Isaac EarleDevelopmentTarget 1TargetT1 and T2 target alignment frames overhauledThe following work was completed on both
the T1 and T2 target alignment frames

    One of the short taper
 8x 
  251   Wednesday, May 22, 2019, 14:25 Isaac EarleRepairTarget 1TargetT1-MK2 target moved to HC; T1-MK1 target moved to BLAfter extensive
testing over the last 2 weeks it was determined
 T1-MK1_target_info_sheet_-_Installed_May_21_2019.pdf 
  250   Tuesday, April 16, 2019, 15:35 Keith C NgRepairOtherM9M9 project post shutdown summary Completed work at m9 beam line:
- Removed existing service stand
and associated cable and water services.
  
  249   Tuesday, February 26, 2019, 10:55 Isaac EarleMaintenanceTarget 1CoolingT1 and T2 MRO work and solenoid valve change summaryThe following work was completed between
Jan 16 - Feb 19, 2019:

    T1 and T2 cooling packages
  
  248   Friday, January 25, 2019, 10:53 maicodallavalleRepairOtherCyclotron electricalCyclotron Elevating system Motor electrical wire repairs2018 Cyclotron lid up problem. Station
#9 was  found to  have the motor
wires along the beam plain had damaged wire
  
  247   Thursday, January 10, 2019, 13:51 Isaac EarleMaintenanceTarget 1CoolingT1 and T2 cooling packages inspectedThe T1 and T2 cooling packages were inspected
today while running.  No water leaks
were observed at either package including
  
  246   Thursday, November 01, 2018, 13:57 Keith C NgOtherOtherOthernuclear venillation in hot cells not workingRandomly checked on the nuclear ventilation
for the Meson Hall Hotcells and discovered
they were not running again (both magnahelic
  
  245   Thursday, October 25, 2018, 08:58 Keith C NgRepairOtherOtherT1 collimator valve solenoid coil replaced againOn
23rd October we restarted the T1 and T2 water
packages after the mini shutdown and after
  
  244   Thursday, September 06, 2018, 13:49 Isaac EarleRepairTarget 1CoolingT1 cooling package secondary side solenoid failed On Friday Aug 31 at approximately
3am T1CS:FGSEC dropped to 0gpm flow. 
This was confirmed to be a real reading when
  
  243   Tuesday, August 28, 2018, 11:16 Isaac EarleStandard OperationOtherOtherSouth TNF Holding Tank water released The water in the South TNF Holding
Tank was released today under work permit
#C2018-08-28-3.  The tank contained
  
  242   Thursday, August 23, 2018, 11:52 Isaac EarleRepairTarget 1CoolingT1 cooling package pump failure and replacementOn Wednesday August 15th the T1 cooling
package tripped off, and could not be restarted. 
On the EPICS screen the pump device went
 TUS1801057_Triumf.pdf 
  241   Monday, July 23, 2018, 09:39 Isaac EarleRepairTarget 1CoolingT1 collimator solenoid valve failed - Solenoid replacedOn Saturday July 21st the T1 Collimator
solenoid valve would not re-open after tripping
closed due to a (planned) loss of vacuum. 
  
  240   Tuesday, July 03, 2018, 11:09 Isaac EarleRepairTarget 1CoolingT1 cooling package outlet water pressure sensor replaced The T1 cooling package outlet water
pressure sensor (B1A:T1CS:PGOUT) was replaced
this morning with a new unit.  Over
  
  239   Friday, June 01, 2018, 17:50 Isaac EarleRepairTarget 1CoolingT1 collimator solenoid valve coil replacedFlow stopped through the T1 collimator
cooling loop around the same time as a power
bump this afternoon.  The problem was
  
  238   Thursday, May 10, 2018, 15:23 Isaac EarleRepairTarget 1TargetT1-MK2 protect monitor and profile monitor replacedDuring first injection of beam down 1A
problems were encountered with the T1 protect
monitor.  Testing was done by Probes
  
  237   Friday, April 13, 2018, 14:21 Isaac EarleMaintenanceOtherOtherM20 beam blocker MRO and T1/T2 final checksThe M20 beam blocker main shaft seals were
replaced as per the T1/T2 target device maintenance
schedule.  Both air cylinders were found
  
  236   Tuesday, April 10, 2018, 11:20 Isaac EarleMaintenanceOtherCoolingT1 and T2 cooling package shutdown MRO work The following work was performed
on the T1 and T2 cooling packages during
the 2018 shutdown:
  
  235   Friday, April 06, 2018, 15:05 Isaac EarleStandard OperationTarget 2TargetT2-MK2 target MROThe following is a summary of MRO work
done on the T2-MK2 target during the 2018
shutdown:
  
  234   Wednesday, March 28, 2018, 10:12 Isaac EarleStandard OperationOtherOtherFive waste pails moved to East Vault Tunnel for storage Five 5 gallon metal pails with active
waste were moved from the Warm Cell to the
Cyclotron East Vault Tunnel today for long
  
  233   Thursday, March 22, 2018, 17:24 Isaac EarleStandard OperationOtherActive SumpRH Lab active sump released The RH Lab active sump level reached
the high limit yesterday due to an overflow
of the ultrasonic cleaner in the Rad Waste
  
  232   Wednesday, January 10, 2018, 17:45 Isaac EarleStandard OperationTarget 2TargetT2-MK2 beam spot photos, M20BB moved to storage pit The T2-MK2 target was moved from
the beamline to the hot cell on January 8th. 
The field at 0.5m was 130mSv/hr.  Photographs
 T2-MK2_Position_4_beam_spot_photo_-_12mm_Be_-_Jan_10_2018.jpgT2-MK2_Position_4_beam_spot_photo_-_12mm_Be_-_Jan_10_2018_s.jpg 
  231   Thursday, December 07, 2017, 13:54 Isaac EarleDevelopmentOtherOtherWaste pails transferred from warm cell storage bunker to rad waste pitSix 5 gallon pails were transferred this
morning from a temporary storage bunker in
the Warm Cell to the Rad Waste Pit for long
 IMG_0102.JPGIMG_6285.JPGIMG_0102.JPGIMG_6285.JPG 
  230   Thursday, October 26, 2017, 16:12 Isaac EarleRepairTarget 1CoolingT1 collimator solenoid valve replaced Around 10pm on Sunday Oct 22 beam
was tripped multiple times due to low flow
for the T1 collimator cooling circuit (B1A:T1:FGCOL). 
  
  229   Tuesday, October 10, 2017, 12:09 Isaac EarleStandard OperationTarget 2TargetT2-MK2 position 4 target changedThe following work was performed on
the T2-MK2 target assembly during the 2017
fall shutdown:
 20171005_t2target_0010.jpg20171005_t2target_0015.jpg20171005_t2target_0016.jpg 
  228   Tuesday, August 29, 2017, 12:17 Isaac EarleMaintenanceTarget 1TargetT1-MK1 and T2-MK1 Hansen water fittings replaced The #6 male Hansen fittings for the
T1-MK1 and T2-MK1 targets (both currently
stored in the target storage pit) were replaced
  
  227   Thursday, July 27, 2017, 09:34 Keith C NgDevelopmentOtherOthertest 2test 2   
  226   Thursday, July 27, 2017, 08:57 Isaac EarleOtherTarget 2CoolingFailed T2CS:SVSEC valves investigation The three failed T2 cooling system
secondary side solenoid valves were tested
yesterday to try to determine the problem.
  
  225   Tuesday, July 25, 2017, 19:23 Isaac EarleRepairTarget 2CoolingT2 Heat Exchanger Secondary Side Solenoid Valve Failure (again) At approximately 13:50 today the
T2 cooling system secondary side solenoid
valve (T2CS:SVSEC) failed to a closed position.
  
  224   Monday, July 10, 2017, 16:20 Keith C NgRepairTarget 2TargetT2 Heat Exchanger Secondary Side Solenoid Valve Failure The T2 heat exchanger secondary side solenoid
failed on July 9 at approximately 19:30 (EPICS
ID: B1A:T2CS:SVSEC).  The valve was
 20170710_t2_water_package_repair.pdf 
  223   Monday, May 15, 2017, 16:55 Isaac EarleOtherTarget 2TargetT2 profile monitor actuation issue On Thursday May 11th operators attempted
to move the T2 profile monitor (T2-MK2) to
the IN position but were unsuccessful.  The
  
  222   Tuesday, May 09, 2017, 16:35 Isaac EarleRepairTarget 2CoolingT2 target water flow gauge paddle wheel changed During the target move on Thursday
May 4th the paddle wheel and paddle wheel
shaft for the T2CS:FGTGT sensor were changed
 T2CS_FGTGT_strip.jpg 
  221   Friday, May 05, 2017, 15:09 Isaac EarleDevelopmentTarget 2TargetT2-MK2 beam spot check in hot cell On May 5th the T2-MK2 target was
moved to the hot cell for the purpose of
checking the beam spot on the Position 2
 T2MK2_Position_1_and_2_Exit.JPGT2MK2_Position_2_Entrance.JPGT2MK2_Position_2_Exit.JPGT2-MK2_profile_monitor_dislodged.JPG 
  220   Tuesday, April 11, 2017, 17:31 Isaac EarleDevelopmentTarget 2TargetT2-MK2 target MRO and alignment of T2 devicesThe following work was performed on
the T2-MK2 target assembly and the T2 Protect
assembly for maintenance purposes and to
 T2-MK2_-_2017.pdf 
  219   Tuesday, April 11, 2017, 17:02 Isaac EarleMaintenanceTarget 2CoolingT2 Cooling System MRO The following work has been completed
on the T2 cooling package:
- T2 system drained to South TNF
  
  218   Wednesday, April 05, 2017, 17:55 Isaac EarleDevelopmentOtherTargetT2 area devices alignment strategyA strategy for alignment of the T2 protect
monitor, T2 target, and T2 Collimator A was
discussed today and decided upon by Yuri
 Re__T2_target_and_protect_adjustment.pdf 
  217   Thursday, March 30, 2017, 09:48 Isaac EarleDevelopmentOtherControlsT1/T2 control system de-glitching & target ID changes The following changes were made to
the T1/T2 PLC control system:
- De-glitching system investigated
  
  216   Monday, March 27, 2017, 16:15 Isaac EarleRepairTarget 1CoolingT1 Cooling System Target Water Return Hose DamagedThe 18' shielding block which lies west
of the T1 cooling package was removed on
Friday Mar 24 so that vacuum equipment could
 IMG_8077.JPGIMG_8076.JPG 
  215   Wednesday, March 15, 2017, 16:13 Isaac EarleStandard OperationOtherActive SumpMeson Hall Hot Cell Lab Active Sump Water Released On March 13th in the morning the
Meson Hall Hot Cell Lab active sump reached
the high level sensor.  The system responded
  
  214   Thursday, January 19, 2017, 08:55 Isaac EarleStandard OperationTarget 1CoolingT1 MRO work completeThe following work was completed on
the T1 cooling package:
- water drained to BL1A holding
  
  213   Thursday, January 12, 2017, 09:21 Isaac EarleStandard OperationTarget 2TargetT2-MK2 Position 1 Beam Spot The beam spot on the 10cm beryllium
target in Position 1 on T2-MK2 (Target ID:
"OCT.06#3") was measured and photographed
 T2-MK2_Posn_1_Beam_Spot_-_Jan_11_2017.jpgT2-MK2_Position_1_Beam_Spot_Measurements_-_Jan_11_2017.pdf 
  212   Monday, January 09, 2017, 15:07 Isaac EarleStandard OperationTarget 2TargetT2-MK2 Target Moved from BL to HC The T2-MK2 target assembly was moved
from the beam line to the hot cell today.
 A maximum field of 203mSv/hr was measured
  
  211   Thursday, November 17, 2016, 17:58 Isaac EarleRepairTarget 2CoolingT2 Heat Exchanger Secondary Side Solenoid Valve Failure At approximately 11am today the T2
cooling package heat exchanger secondary
side water flow suddenly dropped from ~11gpm
  
  210   Thursday, October 06, 2016, 12:16 Isaac EarleDevelopmentTarget 1ControlsExpansion Tank High Level Warning Added An expansion tank high level warning
has been added to the T1/T2 control system
under Work Request #4011.  The purpose
  
  209   Friday, September 30, 2016, 16:59 Isaac EarleRepairTarget 1CoolingT1 Cooling System Inlet Pressure Transducer Replaced The T1 cooling system inlet pressure
transducer (EPICS ID: B1A:T1CS:PGIN,  Omega
part # PX315-100GI) began failing in August
  
  208   Friday, September 30, 2016, 16:54 Isaac EarleRepairTarget 1TargetT1-MK2 - New Beryllium Targets Installed The following work was performed
on the T1-MK2 target assembly during the
September 2016 Mini-shutdown:
 T1-MK2_Posn_4_Entrance_Window_Beam_Spot_-_Sept_27_2016.JPGT1-MK2_Posn_4_Exit_Window_Beam_Spot_-_Sept_27_2016.JPGTarget_Info_Sheet_&_Elevations.pdf 
  207   Thursday, September 08, 2016, 17:26 Isaac EarleDevelopmentOtherActive SumpNew Active Sump High Level Switch and Electronics InstalledTo address the deficiencies identified
in E-Logs #204 and #205 the old active sump
high level switch was replaced with Omega
 IMG_7381.JPGIMG_7386.JPGRH_HC_Lab_Active_Sump_High_Level_Sensor_-_Electrical_Schematic.pdf 
  206   Tuesday, August 30, 2016, 14:09 Isaac EarleDevelopmentOtherControlsT1/T2 PLC Code Update A new version of the T1/T2 PLC code
has been uploaded to the PLC CPU.  The
main change in the new version is a fix to
  
  205   Wednesday, July 06, 2016, 13:31 Isaac EarleOtherOtherActive SumpActive Sump RCR Lab and MCR Alarms Not Working - Suspect Controls IssueFurther tests were done on the active sump
high level float switch today.  The
switch was triggered 1 time by filling the
  
  204   Tuesday, June 28, 2016, 16:28 Isaac EarleOtherOtherActive SumpRH MH Hot Cell Lab Active Sump High Level Sensor Test The high level sensor for the Meson
Hall Hot Cell Lab Active Sump was tested
today and worked as expected.  When
  
  203   Tuesday, June 28, 2016, 08:32 Isaac EarleOtherOtherActive SumpRH MH Hot Cell Lab Active Sump Overflow A call was received from the MCR
at approximately 21:30 on Monday June 27th
to report that active drains in the east
  
  202   Tuesday, June 21, 2016, 09:25 Isaac EarleDevelopmentOtherControlsT1/T2 EPICS System With-Beam Testing With-beam commissioning tests were
completed today by Tony Tateyama and Isaac
Earle.  The test results are attached
 T1T2_EPICS_Section_7_Commissioning_Results.pdf 
  201   Wednesday, June 15, 2016, 11:00 Isaac EarleStandard OperationTarget 2TargetT2-MK2 Target Moved to Position #1 Position #4 on the T2-MK2 target
has now reached the maximum beam time.  The
target was moved to Position #1 at the nominal
  
  200   Friday, May 13, 2016, 15:04 Isaac EarleStandard OperationTarget 2TargetT2-MK2 Position 4 Adjusted to +1.5mm OffsetThe T2-MK2 target at Position 4 has been
adjust to approximately +1.5mm offset.  This
causes the ladder to be moved downwards,
  
  199   Friday, April 22, 2016, 14:45 Isaac EarleOtherOtherActive SumpRH MH Hot Cell Lab Active Sump Water ReleasedThe Remote Handling Hot Cell Lab Active
Sump has been released to city sewer following
the procedure in Document-64834.  The
  
  198   Wednesday, April 20, 2016, 10:01 Isaac EarleStandard OperationTarget 1TargetT1/T2 Monitor Electrical Check CompleteMike Russell from Diagnostics Group has
completed an electrical check on the T1 and
T2 profile and protect monitors.  He
  
  197   Friday, April 15, 2016, 14:54 Isaac EarleStandard OperationTarget 2TargetT2-MK2 Target Changes & Return to BeamlineOn April 11th the T2-MK2 target was flushed
with water, then overnight with air at 5psi
supply pressure.  The target ladder
 T2-MK2_Position_4_Entrance_Side_-_April_14_2016.JPGT2-MK2_Position_4_Exit_Side_-_April_14_2016.JPGIMG_7024.JPGIMG_7026.JPG 
  196   Monday, April 11, 2016, 13:54 Isaac EarleStandard OperationTarget 2TargetT2-MK2 Target Transported from BL to HCThe T2-MK2 target was transported from
the beam line to the hot cell using the transfer
flask.  The target was measured to be
  
  195   Monday, April 11, 2016, 13:51 Isaac EarleDevelopmentOtherOtherTarget Transfer Flask Hoist Hook Lower Limit Adjusted The lower limit of the flask hoist
hook has been adjusted.  The travelling
nut for the lower limit was rotated 3 notches
  
  194   Thursday, April 07, 2016, 16:44 Isaac EarleDevelopmentOtherControlsT1/T2 Controls "Assembly Tests" CompletedThe T1/T2 Control System "Assembly
Tests"  (Document 118467 Release
#1, Section 5) have been completed.  The
  
  193   Thursday, March 31, 2016, 11:48 Isaac EarleStandard OperationTarget 1TargetT1 & T2 Beryllium Target Manufacturing CompleteManufacturing of a new batch of T1 and
T2 beryllium targets has been completed.
The job was completed under Machine
 T1_T2_Be_Target_Documentation_(2016_Batch).xlsx 
  192   Thursday, March 24, 2016, 15:38 Isaac EarleDevelopmentTarget 1TargetT1/T2 Beryllium Target Test Jig Fabrication CompleteFabrication of the T1/T2 beryllium target
testing jig (TBP1721) was completed today
by Dan MacDonald.  With a target installed
 IMG_6904.JPG 
  191   Thursday, March 24, 2016, 14:46 Isaac EarleOtherOtherOtherTNF / 500MeV Resin Cans Removed from Storage Pit #1Three used TNF / 500MeV system cooling
system resin cans were removed from the Meson
Hall target storage pit (two from Hole #1,
  
  190   Wednesday, March 16, 2016, 16:50 Isaac EarleDevelopmentTarget 2ControlsPreliminary Testing of T2 Control System CompletePreliminary testing of the new
PLC control system and EPICS interface was
 T2_Testing_Checklist_-_Complete_-_March_16_2016.pdf 
  189   Monday, March 07, 2016, 18:22 Isaac EarleDevelopmentTarget 1ControlsPreliminary Testing of T1 Control System Complete Preliminary testing of the new PLC
control system and EPICS interface was completed
today for the T1 target, T1 cooling package,
 T1_Testing_Checklist_-_Complete_-_March_7_2016.pdf 
  188   Wednesday, February 24, 2016, 13:03 Isaac EarleRepairOtherOtherTarget Flask 2-Ton Hoist Chain Twist Corrected A 1/2 turn twist in the target flask
hoist chain has been corrected to address
a deficiency observed by inspectors by Gordon
  
  187   Wednesday, February 03, 2016, 17:35 Isaac EarleStandard OperationTarget 2CoolingT2 MRO WorkThe following work was performed at the
T2 cooling package and target between Jan
25 - Feb 3, 2016:
  
  186   Monday, January 25, 2016, 16:54 Isaac EarleMaintenanceTarget 1CoolingT1 MRO WorkThe following work was performed at the
T1 cooling package and target between January
18-21, 2016:
  
  185   Monday, January 18, 2016, 17:19 Isaac EarleStandard OperationTarget 1CoolingT1 & T2 Packages Drained; BL1A Holding Tank Released The T1 and T2 cooling packages were
drained to the BL1A holding tank on Jan 8
2016.  The volumes were 100L and 80L
  
  184   Thursday, December 17, 2015, 13:31 Grant MinorDevelopmentOtherTargetT1/T2 Target Cassette - window / end cap manufacturing change (WO 41527)Isaac Earle has recently been managing
the fabrication of some new Be  target cassettes
for the T1 / T2 Meson Hall target ladders
 Left_new_right_old_ref_TBP1683_16Dec2015.JPGTBP1690_left_new_right_old_16Dec2015.JPGTBP1683_forming_tool_16Dec2015.JPGNew_Frame_Ref_TBP1696_16Dec2015.pdf 
  183   Thursday, November 05, 2015, 17:07 Isaac EarleRepairTarget 2TargetT2-MK1 Profile Monitor Repair and Pos'n 3 Target RemovalThe following work was performed on the
T2-MK1 target.  The profile monitor
and monitor cage on this target were damaged
 8x 
  182   Tuesday, October 13, 2015, 10:52 Isaac EarleStandard OperationTarget 1TargetT1 & T2 Target Ladder Moves The T1 and T2 targets were both moved
from Position 0 to Position 4 at approximately
2:30am on Saturday October 10th using the
  
  181   Friday, October 09, 2015, 15:52 Isaac EarleRepairTarget 1TargetT1-MK2 Protect Monitor Replacement and InspectionWhen the damage to the T2 Protect Monitor
was found to be caused by flying debris from
a vacuum spike (see e-log #179), it was decided
 12x 
  180   Friday, October 09, 2015, 15:18 Isaac EarleRepairTarget 2TargetT2-MK2 Check at Hot Cell and Motor Drive Cable ReplacementWhile the T2 monolith was uncovered for
T2 Protect repair (see previous e-log), it
was decided that the T2 target should be
 7x 
  179   Friday, October 09, 2015, 14:56 Isaac EarleRepairTarget 2OtherT2 Protect Monitor ReplacementOn Monday Oct 5th a decision was
made to uncover and remove the T2 Protect
Monitor due to faulty readings.  The
 9x 
  178   Tuesday, October 06, 2015, 14:04 Isaac EarleOtherOtherControlsInstructions for loading display screen for T1/T2  The following instructions were provided
by Graham Waters:
 
  
  177   Monday, October 05, 2015, 15:25 Isaac EarleStandard OperationOtherOtherOld T2 Protect Monitor Cassette Update The T2 protect monitor cassette removed
in April 2015 (see E-log #154) was surveyed
today.  It was approximately 3mSv/hr
  
  176   Friday, October 02, 2015, 17:25 Ron KuramotoStandard OperationTarget 1TargetRaise Target to lower Rad levels for 1AM7 repairToday the T1MK2 target was moved from Position
4 to Position 0 to lower the Rad fields for
the 1AM7 repair in the 1A Tunnel. The Rad
  
  175   Thursday, October 01, 2015, 11:43 Isaac EarleRepairTarget 2TargetT2-MK2 Target Ladder Drive Motor Failure The stepper motor that drives the
target ladder on T2-MK2 has failed.  This
is the cause of the difficulty moving the
  
  174   Wednesday, September 30, 2015, 17:07 Isaac EarleStandard OperationTarget 2TargetTarget Moves for Profile Check - Possible Motor or Control Box FailureThe T1 and T2 targets were moved to position
zero, then back to the target position today
so that beam profile could be checked using
  
  173   Monday, September 28, 2015, 11:33 Isaac EarleRepairOtherWater LeakWarm Cell Water Window Repair CompleteThe warm cell water window tanks were filled
on September 17 after 2 weeks of curing time.
 A water leak was found coming from
  
  172   Monday, September 28, 2015, 10:29 Isaac EarleStandard OperationOtherActive SumpRH Hot Cell Lab Active Sump High Level Sensor Tested The RH hot cell lab active sump high
level sensor was tested as part of the yearly
scheduled inspection.  High water level
  
  171   Thursday, August 27, 2015, 15:47 Isaac EarleRepairOtherWater LeakWarm Cell Water Window Seal Replacement UpdateSince the previous E-Log the following
tasks have been completed:
- Panel spacer rods installed at
  
  170   Wednesday, August 19, 2015, 12:10 Isaac EarleRepairOtherOtherWarm Cell Water Window Seal Replacement StatusThe following tasks were completed over
the past 2 weeks:
- Aquarium Technology Ltd. (UK) was
 6x 
  169   Thursday, August 13, 2015, 09:47 Isaac EarleDevelopmentOtherOther"Clamp A" disassembled and used to build clamp "TRH1257-#01"The 4" Marman flange clamp (IRH0001)
labeled "Clamp A",  as used
in the testing detailed in Document-114623
  
  168   Friday, July 17, 2015, 10:14 Isaac EarleDevelopmentTarget 1TargetT1/T2 Be Target Failure History & Replacement PlanT1 and T2 beryllium target failure history
was investigated back to 2000 (as far as
XSTRIP records were readily available).  For
 T1_and_T2_Be_Target_History_-_July_17_2015.pdf 
  167   Wednesday, July 15, 2015, 10:33 Isaac EarleStandard OperationTarget 1CoolingT1 & T2 Cooling System Check- All T1 and T2 values on XTPAGE were stripped
back to April 1, 2015:  All systems
appear to be functioning normally, nothing
  
  166   Thursday, July 09, 2015, 13:51 Isaac EarleDevelopmentOtherTargetNew T1 and T2 Beryllium Targets OrderedAn order for new T1 and T2  beryllium
targets was submitted to the TRIUMF machine
shop today.  A total of seven T2 targets
  
  165   Wednesday, July 08, 2015, 16:21 Isaac EarleDevelopmentTarget 1Target0.003" 347 SS Sheet for T1/T2 Targets Received A 5lb roll of 347SS sheet was received
today.  This alloy is to be used for
the target windows of the new T1 and T2 beryllium
 347SS_Mill_Spec_Test_Report_-_July_8_2015.pdf 
  164   Tuesday, June 23, 2015, 10:24 Isaac EarleStandard OperationOtherOtherBL1A Holding Tank Water Released The water in the BL1A holding tank
was released to the city sewer.  This
water was sampled, tested, and approved for
  
  163   Friday, June 19, 2015, 17:11 Isaac EarleDevelopmentOtherControlsPLC Test of Ultrasonic Level SensorThe new T1/T2 level sensors
(Omega LVCN414) were hooked up to the PLC
 Overnight_Level_Sensor_PLC_Test.jpg 
  162   Thursday, June 11, 2015, 16:59 Isaac EarleDevelopmentOtherControlsLab Test of New T1/T2 Level SensorsThe new T1/T2 level sensors (Omega LVCN414)
were tested in the RH HC lab today using
the Omega software on a laptop and positioning
  
  161   Monday, May 25, 2015, 12:48 Isaac EarleRepairTarget 1ControlsT1/T2 Controls System CrashAt 9:15am this morning BL1A tripped off
due to loss of the watchdog signals for the
T1/T2 control system.  Graham Waters
  
  160   Tuesday, May 12, 2015, 21:20 Grant MinorStandard OperationTarget 1TargetT1 & T2 Targets moved from pos. 0 to pos. 4Grant moved the T1 and T2 targets from
position 0 to position 4 this evening at
around 9pm.
  
  159   Friday, May 08, 2015, 09:48 Isaac EarleStandard OperationOtherOtherBL1A Blocks RestoredReplacement of the BL1A blocks was completed
yesterday (May 8, 2015) in preparation for
first beam down 1A on May 12th.  The
 1A_Shield_Blocks_Restored_for_1A_beam_2015_&_2014.pdf 
  158   Friday, May 01, 2015, 16:01 Isaac EarleRepairTarget 1OtherRH Warm Cell Used by Beamlines Group for TNF Heat Exchanger Leak CheckThe Meson Hall RH Lab Warm Cell was used
by Beamlines Group for hydrostatic testing
of the TNF heat exchanger.  The location
 IMG_1510.JPGIMG_1511.JPGIMG_1512.JPG 
  157   Tuesday, April 28, 2015, 15:55 Isaac EarleDevelopmentTarget 1TargetTarget Version Jumper Wires Installed for T1-MK1 and T2-MK1 The T1-MK1 and T2-MK1 targets have
been re-wired to allow version identification.
 Work was performed in the target storage
  
  156   Friday, April 24, 2015, 11:53 Isaac EarleStandard OperationTarget 2TargetT2-MK2 Target Info Sheet & ElevationsT2-MK2 target information sheet, beam spot
measurements, and elevations were updated
and delivered to Operations. PDF copy attached.
 T2-MK2_-_2015_Elevations.pdf 
  155   Thursday, April 23, 2015, 16:29 Isaac EarleStandard OperationTarget 1TargetT1 & T2 Profile and Protect Monitors Electrical Check CompletedAn electrical check has been completed
for the T1 & T2 Profile and Protect Monitors
by Dave Cameron and Mike Russell.  They
  
  154   Thursday, April 23, 2015, 13:40 Isaac EarleDevelopmentTarget 2OtherT2 Protect Monitor Elevation Adjustment- T2 Protect Monitor moved from the beam
line to the hot cell on Monday April 20th
- Elevation of the plate center measured
 Old_T2_Protect_Monitor_(removed_Apr_22_2015)_-_Entry_Side.jpgOld_T2_Protect_Monitor_(removed_Apr_22_2015)_-_Exit_Side.jpg 
  153   Wednesday, April 22, 2015, 15:17 Isaac EarleDevelopmentTarget 1TargetT1-MK2 wired for version identification The T1-MK2 target was wired for automatic
target version detection by the new PLC control
system (A to C jumper  in POT/CAM MS
  
  152   Wednesday, April 22, 2015, 15:15 Isaac EarleStandard OperationTarget 1CoolingT1 and T2 Cooling Packages ReadyBoth cooling packages are running steadily
with the targets in Position 0.  
The demin flow (Q2) for both was
  
  151   Wednesday, April 22, 2015, 09:46 Isaac EarleDevelopmentTarget 1TargetWater Sensors Installed on T1 Monolith Four water sensors have been installed
on top of the T1 monolith.  These water
sensors were wired and brought to the area
 T1_Water_Sensors.jpgIMG_4859.JPGIMG_4860.JPG 
  150   Tuesday, April 21, 2015, 13:38 Isaac EarleStandard OperationTarget 1TargetAir Amplifier Started. T1 & T2 Profile Monitor Actuation Checked The lower air amplifier has been
started, and air supplied to the T1 and T2
areas by opening the appropriate ball valves
  
  149   Tuesday, April 21, 2015, 12:59 Isaac EarleStandard OperationTarget 1TargetT1-MK2 target moved from storage pit to beam line The T1-MK2 target was transported
from the storage pit to the beamline.  The
target measured approximately 10mSv/hr at
  
  148   Monday, April 20, 2015, 11:42 Isaac EarleStandard OperationTarget 2TargetT2-MK2 Target & T2 Protect Moved The T2-MK2 target was moved from
the hot cell to the beam line. The T2 Protect
Monitor was moved from the beam line to the
  
  147   Thursday, April 09, 2015, 13:56 Isaac EarleDevelopmentTarget 2TargetT2-MK2 target wired for version identification, cable ties replaced, ready for useThe "POT/CAM" MS connector on
the T2-MK2 has been wired to allow automatic
target version number identification by the
  
  146   Tuesday, March 31, 2015, 17:40 Isaac EarleRepairTarget 2CoolingT2 Thermistors ReplacedThe Inlet (T1), Outlet (T2), Col.A (T6),
and Col. B (T7) thermistors at the T2 cooling
package all gave intermittent faulty readings
  
  145   Thursday, March 12, 2015, 10:51 Isaac EarleStandard OperationTarget 2TargetT2-MK2 Pos'n 4 Elevation MeasurementsElevation measurements of the T2-MK2 target
were taken in the hot cell to confirm previous
records in preparation for the T2 Protect
  
  144   Wednesday, March 04, 2015, 18:08 Isaac EarleRepairTarget 2CoolingT2 Cooling Package MRO UpdateThe following work was done today at the
T2 cooling package:
- Remainder of #4 Hansen o-rings
  
  143   Friday, February 27, 2015, 18:06 Isaac EarleDevelopmentTarget 1TargetT1 Rotary Collimator Water and Air Line Investigation Ron Kuramoto, Keith Ng, John McKinnon,
and myself spent some time today investigating
water and air lines related to the T1 Rotary
  
  142   Friday, February 20, 2015, 13:55 Isaac EarleStandard OperationTarget 2TargetT1 & T2 Target Moves- The T1-MK1 target was moved from the
hot cell to storage pit hole #3 (ready as
T1 spare)
  
  141   Wednesday, February 18, 2015, 14:49 Isaac EarleRepairTarget 1TargetT1-MK1 Repair CompleteThis is a continuation of work detailed
in E-Log #129 and #140.
- Static water test performed on
 IMG_4638.JPGIMG_4646.JPGIMG_4647.JPG 
  140   Friday, February 06, 2015, 12:39 Isaac EarleRepairTarget 1TargetT1-MK1 Repair Status (Pos'n 1 Plug Leak) The T1-MK1 target is currently in
the hot cell for repair of a leak at position
1.  See E-Log #129 for details on previous
 IMG_4603.JPG 
  139   Monday, February 02, 2015, 16:06 Isaac EarleMaintenanceTarget 2CoolingT2 MRO Status- T2-MK2 target (currently in the T2 monolith)
purged with air
  
  138   Tuesday, January 27, 2015, 17:38 Isaac EarleRepairTarget 1CoolingT1 Cooling Package 3/4" Valves Rebuilt - T1 MRO Complete- Both 3/4" ball valves on the T1
cooling package target water circuit were
rebuilt, leak tested with house air pressure,
  
  137   Friday, January 23, 2015, 13:28 Isaac EarleRepairTarget 2CoolingT2 Cooling Package Thermistor DefeatsBoth defeats applied to T2 cooling package
thermistors were removed today (Col. B interlock
was jumpered, and the target water inlet
  
  136   Wednesday, January 14, 2015, 15:06 Isaac EarleStandard OperationTarget 1OtherActive Item Stored in East Hot CellThe active item discovered on January 9,
2015 outside the BL1A bootbox has been moved
to the Meson Hall east hot cell for storage.
  
  135   Wednesday, January 14, 2015, 13:32 Isaac EarleStandard OperationTarget 1TargetT1-MK2 Moved from B/L to Storage PitThe T1-MK2 target was transferred from
the beam line to the storage pit in hole
#5 using the transfer flask.  A maximum
  
  134   Monday, January 12, 2015, 16:35 Isaac EarleStandard OperationTarget 1CoolingT1 & T2 MRO StatusThe following tasks have been performed
at T1:
- T1 monolith painted using grey
  
  133   Wednesday, January 07, 2015, 17:27 Isaac EarleRepairTarget 2Water LeakWater Leaks at T2 Cooling PackageThe T2 cooling package was visually inspected
today after blocks were removed.  With
the cooling package off the following leaks
  
  132   Monday, January 05, 2015, 15:08 Isaac EarleStandard OperationTarget 2Water LeakCooling Packages Re-Started; Suspect External Water Leak at T2 PackagePumping was restored to 1A today by Vacuum
Group and the beam line returned to normal
vacuum levels.  Both cooling packages
  
  131   Monday, December 22, 2014, 14:31 Isaac EarleMaintenanceTarget 2Water LeakDrop in T2 water levelThis morning at 5:30am the T2 cooling package
expansion tank switched to WARNING LEVEL
NOT OK.  There was no change in BL1A
  
  130   Friday, December 19, 2014, 14:35 Isaac EarleStandard OperationTarget 2OtherAmplified Air Shut OffThe BL1A amplified air system has been
shut off, and will remain off until required
for BL1A start-up in Spring 2015 (the lower
  
  129   Tuesday, December 09, 2014, 14:45 Isaac EarleRepairTarget 1TargetT1-MK1 Repair Status (Pos'n 1 Plug Leak) Between Nov 14 ~ Dec 9 the following
activities took place:
- The leaky 10mm Be target at pos'n
  
  128   Tuesday, November 18, 2014, 10:52 Isaac EarleStandard OperationTarget 1Active SumpRH Hot Cell Lab Active Sump ReleasedRelease of the Remote Handling Hot
Cell Lab active sump water was completed
  
  127   Monday, November 17, 2014, 10:25 Isaac EarleRepairTarget 1OtherAmplified Air Leak In T1 Area RepairedWhile the 1A blocks over the T1 area were
removed last week the opportunity was used
to investigate an air leak on the amplified
 IMG_4263.JPG 
  126   Monday, November 17, 2014, 10:14 Isaac EarleDevelopmentTarget 1Active SumpFilter Installed Downstream of RH HC Lab Active SumpA filter housing and filter were installed
by Dan McDonald on November 14 in the piping
section between the Remote Handling Hot Cell
 IMG_4273.JPG 
  125   Friday, November 14, 2014, 17:30 Isaac EarleRepairTarget 1TargetT1-MK1 Target Failure / T1 Target Swap -
On Nov 13 at ~1am the BL1A vacuum went bad.
 The T1 and T2 volumes were isolated
 T1MK2_Nov_14_2014.pdf 
  124   Thursday, November 06, 2014, 17:22 Ron KuramotoRepairTarget 2Cooling1AT2, faulty Thermister water out temperture

    

       
            
  
  123   Thursday, November 06, 2014, 17:18 Ron KuramotoRepairTarget 2Cooling1AT2 Collimator B, faulty Thermister water out temperature On 14Oct2014, the 1AT2 Collimator B water
outlet temperature rose to 100o
C. 
  
  122   Thursday, October 16, 2014, 17:44 Ron KuramotoRepairTarget 2Water Leak1A Tunnel T2 Cu-ALCW water leak repair 
 6x 
  121   Thursday, September 11, 2014, 15:36 Ron KuramotoRepairTarget 2Water Leak1A Tunnel T2 Cu-ALCW water leakOn Sep. 3rd
during the 6 hr maintenance day, Doug Preddy
 IMG_1007sm.JPGIMG_1009sm.JPG 
  120   Wednesday, August 13, 2014, 16:34 Isaac EarleRepairTarget 1OtherAmplified Air Leak Narrowed Down to T1 Area During the maintenance day today,
amplified air to the T1 area was valved off
in an attempt to pin point the location of
  
  119   Monday, August 11, 2014, 16:57 Isaac EarleRepairTarget 2OtherAir Amplifier Increased Cycle RateOn Friday August 8th Ron Kuramoto observed
that the Meson Hall air amplifier cycle speed
had increased.  Cycle time measurements
  
  118   Wednesday, July 02, 2014, 16:56 Isaac EarleRepairTarget 1CoolingT1-P2 and T2-P1 pressure transducers replaced.The T1-P2 (outlet) pressure transducer
was replaced to address an erroneous signal.
 The XTPAGE value now reads as expected.
  
  117   Tuesday, June 03, 2014, 22:56 Isaac EarleStandard OperationTarget 2TargetT2 Target Position Moves (Development Shift)The T2 target was moved from Position 4
to Position 0 at 11:15am so the profile monitor
could be used during the development shift.
  
  116   Wednesday, May 14, 2014, 20:36 Grant MinorDevelopmentTarget 2TargetTarget exercised to position 0, then back to 2.0 mm above position 4The T2 target was exercised to position
0 around 6:15pm so that the T2 profile monitor
could be used by operations.  The T2
  
  115   Monday, May 05, 2014, 15:46 Isaac EarleRepairTarget 2TargetT2 Protect Returned to B/LThe T2 protect monitor was returned to
the beam line using the shielded flask.  The
alignment pin did not align with the hole
  
  114   Friday, May 02, 2014, 15:49 Isaac EarleRepairTarget 2TargetT2 Protect Monitor Elevation CorrectionWhen beam was started in mid-April, it
was observed by Operations Group that with
the beam centered vertically within the protect
 RHB_6851.JPGRHB_6850.JPG 
  113   Monday, April 14, 2014, 15:30 Isaac EarleStandard OperationTarget 2TargetT2 Target Moved to Position 4The T2-MK2 target (currently installed
in the beamline) was moved from position
0 to position 4 (10cm Be) using the portable
  
  112   Thursday, April 03, 2014, 16:35 Isaac EarleStandard OperationTarget 1CoolingT1 Cooling Package Started The T1 cooling package was started
around 2pm today.  There was no change
to the T1 volume vacuum during startup.
  
  111   Thursday, April 03, 2014, 13:43 Isaac EarleStandard OperationTarget 2TargetT2 Profile Monitor OKT2 Profile Monitor actuation was tested
today from the control room and all is working
properly.  The position (IN / OUT) also
  
  110   Thursday, April 03, 2014, 10:19 Isaac EarleStandard OperationTarget 2CoolingT2 Cooling Package Resin Can ReplacedThe resin can was removed from the T2 cooling
package and transported to the warm cell.
 A replacement can with fresh resin
 T2_Conductivity.jpg 
  109   Tuesday, April 01, 2014, 10:17 Isaac EarleRepairTarget 2TargetT2 Profile Monitor Actuation - Fault ReportThe T2 profile monitor cannot be actuated
from the control room.  When the solenoid
valve that supplies air to the air cylinders
  
  108   Friday, March 28, 2014, 13:59 Isaac EarleMaintenanceTarget 2CoolingT2 P1 Transducer and T2 Q1 Flow Meter ReplacedThe T2 P1 pressure transducer (Omega PX315-100GI)
and T2 Q1 Proteus flow meter (0150SSTF3)
have been replaced with new units to address
  
  107   Tuesday, March 25, 2014, 18:24 Isaac EarleDevelopmentTarget 2Water LeakWater Detecting Sensor Install at T1 & T2Water detecting strips were installed around
the T1 and T2 areas today with Doug Preddy
and contractors from SMT Research.  Four
 9x 
  106   Monday, March 24, 2014, 18:14 Isaac EarleStandard OperationTarget 2CoolingT2 Cooling Package & Air Amplifier StartedBill Rawnsley completed an electrical check
of the T2 profile monitor today from the
Meson Hall mezzanine - All OK.  
  
  105   Tuesday, March 11, 2014, 13:50 Isaac EarleRepairTarget 2TargetT2 Protect Monitor Returned to Beam LineAfter the monitor assembly was moved to
the hot cell, electrical checks were performed
by Bill Rawnsley which showed the same results
  
  104   Monday, March 03, 2014, 11:55 Isaac EarleRepairTarget 2TargetT2 Protect Monitor Moved to HC The T2 Protect Monitor was transported
from the beam line to the hot cell this morning
using the transport flask.  The move
 IMG_1934.JPGIMG_1939.JPGIMG_1973.JPG 
  103   Thursday, February 13, 2014, 14:27 Isaac EarleStandard OperationTarget 2TargetT2 Target MovesThe T2-MK1 target was moved from the beam
line to the target storage pit in position
4.  The target was measured to be 30mSv/hr
  
  102   Thursday, February 06, 2014, 17:05 Isaac EarleStandard OperationTarget 1CoolingT1 & T2 Cooling Package Filters ChangedWater was drained from the T1 and T2 cooling
packages, samples taken, and delivered to
RPG.
  
  101   Wednesday, January 22, 2014, 15:41 Isaac EarleStandard OperationTarget 2Water LeakWater Drained From Suck Tube Released After approval from RPG, the water
drained from the suck tube, which was stored
in a bucket in the RH lab active sink area,
  
  100   Monday, January 20, 2014, 11:51 Isaac EarleRepairTarget 2Water LeakWater Leak from Meson Hall Mezzanine Near T2 A water leak developed this morning
from a city water supply line at a hose connection
near the T2 expansion tank.  Water was
  
  99   Friday, January 17, 2014, 15:41 Isaac EarleStandard OperationTarget 1TargetWater Purged from T1 & T2 TargetsWater was purged from the T1 and T2 targets
using compressed air.  The water is
stored in a labeled bucket on the BL1A blocks
  
  98   Friday, January 17, 2014, 10:10 Isaac EarleStandard OperationTarget 1CoolingT1/T2 Cooling Packages & Air Amplifier Shut Off In preparation for Edi to vent the
BL1A vacuum volume, the T1 and T2 cooling
packages were both shut off.  They will
  
  97   Wednesday, January 15, 2014, 15:38 Isaac EarleStandard OperationTarget 2Water LeakSuck Tube Drained and RinsedThe suck tube vessel was drained, rinsed,
and transported to the active sink area in
the Meson Hall Hot Cell Lab.  There
 IMG_1276.JPGIMG_1291.JPGIMG_1295.JPGIMG_1296.JPGIMG_1297.JPG 
  96   Thursday, January 09, 2014, 15:21 Isaac EarleRepairTarget 2TargetT2-MK2 Electrical Check An electrical check was performed
on the T2-MK2 profile monitor by Bill Rawnsley.
 All signals produced the expected response,
  
  95   Monday, January 06, 2014, 15:55 Isaac EarleRepairTarget 2TargetT2-MK2 Repair The leaking 10cm Be target was removed
from position 3 on the T2-MK2 target ladder
and the water ports were blanked-off with
 DSC_6622.JPGDSC_6623.JPGDSC_6626.JPGIMG_1809.JPG 
  94   Tuesday, November 26, 2013, 10:33 Isaac EarleRepairTarget 2TargetT2-MK2 Water Flush The T2-MK2 target in the hot cell
was flushed with water and then purged with
air so that stagnant water is not left sitting
  
  93   Saturday, November 23, 2013, 18:37 Isaac EarleRepairTarget 2TargetT2-MK1 Installation- T2-MK1 target transported from the storage
area by Isaac and Grant and installed at
the T2 monolith.  All services were
  
  92   Friday, November 22, 2013, 20:26 Grant MinorRepairTarget 2Water LeakT2 Water Leak - Target Assembly Removed and Water Sucked Out of B/LT2 target water leak was identified earlier
this morning.
Isaac Earle, Ron Kuramoto and Keith
 T2_tgt_water_leak_22Nov2013-006-before-suck.JPGT2_tgt_water_leak_22Nov2013-013-after-suck.JPGT2_tgt_water_leak_22Nov2013-016.JPGT2_tgt_water_leak_22Nov2013-017.JPG 
  91   Tuesday, November 12, 2013, 11:49 Isaac EarleRepairTarget 1TargetMH Hot Cell Lab Manipulator Overhaul Complete overhaul of all manipulators
in the Remote Handling Hot Cell Lab in the
Meson Hall was performed by Peter Dudley
  
  90   Wednesday, October 23, 2013, 15:30 Isaac EarleDevelopmentTarget 1CoolingT1 & T2 High Temp Safety Switch Tested An end-to-end test was performed
on the new T1 and T2 high temperature safety
switches yesterday during the maintenance
  
  89   Wednesday, September 25, 2013, 14:05 Isaac EarleStandard OperationTarget 1Active SumpRH Lab Active Sump Level Sensor InspectedA notification was received that the RH
lab active sump level sensor is due for annual
inspection.  The sensor was tested and
  
  88   Wednesday, September 11, 2013, 16:13 Isaac EarleRepairTarget 2CoolingT2 Cooling Package Water Leak Repair The T2 cooling package was uncovered
this morning and a leak was found coming
from the Swagelok ball valve on the 3/4"
  
  87   Monday, September 09, 2013, 16:22 Isaac EarleRepairTarget 1CoolingT1 P1 Transducer Replaced The BL1A tunnel was accessed today
to assess a faulty reading from the T1 cooling
package inlet pressure transducer (T1P1).
  
  86   Monday, September 09, 2013, 16:13 Isaac EarleRepairTarget 2CoolingDrop in T2 Cooling Package Water Level On September 9th in the morning Ron
Kuramoto noticed that the T2 cooling package
expansion tank level was reading NOT OK for
  
  85   Friday, August 23, 2013, 10:39 Isaac EarleRepairTarget 1CoolingT1 Cooling Package Inlet Pressure (P1) Sensor The T1 cooling package inlet pressure
(P1) has been dropping since approximately
May 5, 2013 from the regular operating pressure
 T1_P1_plot_(may-aug).jpgT1_P1_plot.jpg 
  84   Tuesday, June 04, 2013, 13:42 Isaac EarleRepairTarget 1TargetT1 and T2 Power Supply Fans Replaced Replacement of the power supply fans
for the T1 Power Supply, T2 Power Supply,
as well as an additional power supply in
  
  83   Friday, May 31, 2013, 16:07 Isaac EarleRepairTarget 1TargetPower Supply Fan Failure Today (May 31, 2013) I was contacted
regarding a burning smell and high temperatures
around the T1/T2 controls racks.  Erwin
 IMG_1440.JPGIMG_1441.JPGIMG_1442.JPG 
  82   Tuesday, May 14, 2013, 13:26 Isaac EarleDevelopmentTarget 1TargetT1 & T2 Profile ScanThe T1 and T2 profile monitors were used
during today's development shift.  Target
ladder movement for T1 was done at the panel
  
  81   Friday, April 19, 2013, 09:55 Isaac EarleDevelopmentTarget 1CoolingT1&T2 cooling package safety/standards compliance upgrade complete (SASP0120)Yesterday (April 18th) the T1 and T2 cooling
package PRV outlet lines were routed to the
active drain in the 1A tunnel.  All
  
  80   Wednesday, April 17, 2013, 16:45 Isaac EarleStandard OperationTarget 1TargetT1-MK1 Target Leak Checked The T1-MK1 target was leak checked
on April 15th at the T1 monolith by Ron Kuramoto
and Edi Dalla Valle.  No leaks were
  
  79   Wednesday, April 17, 2013, 16:43 Isaac EarleStandard OperationTarget 2TargetT2 target installed; Vacuum leak-tight; Monitors OK; T2 ready for beamThe T2-MK2 target was transferred from
the storage pit to the beam line yesterday
(April 16th).  The field was measured
  
  78   Friday, April 12, 2013, 17:33 Isaac EarleDevelopmentTarget 1CoolingT1 & T2 high-temp limit switch installation, wiring, and commissioning completeInstallation, wiring, and commissioning
of the high temperature limit switches for
the T1 and T2 cooling packages was completed
  
  77   Friday, April 12, 2013, 13:28 Isaac EarleStandard OperationTarget 1CoolingCooling Packages Leak Tight The T1 and T2 expansion tanks were
filled on Monday April 8th.  There was
no change in the level when inspected today
  
  76   Tuesday, April 09, 2013, 17:06 Isaac EarleRepairTarget 1TargetT1 Target Electronics CheckThe T1-MK1 target protect and profile monitor
electronics were 'blip' tested by Bill Rawnsley
on April 5, 2013.  The response from
  
  75   Tuesday, March 26, 2013, 10:55 Isaac EarleMaintenanceTarget 1TargetT1-MK1 Re-wiring and MRO Complete The following work was performed
on the T1-MK1 target:
- Unused proximity sensor removed
 T1-MK1_Tgt_leak_check.PDF 
  74   Monday, March 18, 2013, 15:17 Isaac EarleMaintenanceTarget 2TargetT2-MK2 Target Maintenance and Re-Wiring- T2-MK2 target moved from beamline to
hot cell (Feb 4th)
- Steel target support shield installed
 IMG_1189.JPGIMG_1194.JPGIMG_1197.JPGIMG_1207.JPGT2-MK2_Tgt_leak_check.PDF 
  73   Wednesday, March 06, 2013, 12:13 Isaac EarleMaintenanceTarget 2CoolingT2 Heat Exchanger MRO- The new tube array was picked up from
Kaltech on Feb 8th (observed vessel holding
60psi on hydro test at their shop)
 7x 
  72   Tuesday, February 05, 2013, 09:50 Isaac EarleMaintenanceTarget 2TargetT2-MK2 target moved from beam line to hot cellThe T2-MK2 target was transported from
the beam line to the RH hot cell.  The
profile monitor was secured in the 'in' position
 IMG_0868.JPG 
  71   Tuesday, January 29, 2013, 15:55 Isaac EarleMaintenanceTarget 2CoolingT2 H.E. Transported to Warm CellFriday Jan 25:
- Both sides of heat exchanger drained,
disconnected, and capped
 IMG_0860.JPGIMG_0864.JPG 
  70   Monday, January 21, 2013, 16:18 Isaac EarleStandard OperationTarget 2TargetT2 Cooling Package Water ReleasedThe T2 cooling package water was drained
to the BL1A active sump, refilled, cycled,
and drained again.  Samples of T2 cooling
  
  69   Monday, January 21, 2013, 11:57 Isaac EarleRepairTarget 2TargetFlask Repair On January 15th, when attempting
to move the T2 target from the beam line
to the hot cell, the latch mechanism on the
 IMG_0818.JPGIMG_0824.JPGIMG_0836.JPGIMG_0838.JPG 
  68   Monday, January 14, 2013, 16:55 Isaac EarleStandard OperationTarget 2TargetTarget Move & Damaged Profile MonitorThe T2-MK1 target (spare T2 target) was
transported from the hot cell to the storage
pit today.  
  
  67   Friday, January 11, 2013, 15:48 Isaac EarleStandard OperationTarget 1TargetBL1A Tunnel Accessed The BL1A tunnel was accessed to drain
and sample T2 cooling package water.  A
puddle of water was noticed in the South
 IMG_0801.JPGIMG_0802.JPG 
  66   Tuesday, January 08, 2013, 10:52 Isaac EarleMaintenanceTarget 2TargetT2-MK1 Target Maintenance- T2-MK1 target transported from storage
pit to hot cell
- Proximity sensor removed
  
  65   Tuesday, January 08, 2013, 09:27 Isaac EarleStandard OperationTarget 2TargetBL1A Air Amplifier turned off for duration of shutdown. The BL1A air amplifier
has been shut down by closing the air supply
  
  64   Monday, December 10, 2012, 15:42 Isaac EarleMaintenanceTarget 1TargetT1-MK2 Target Maintenance- T1-MK2 target moved from storage pit
to hot cell
- Removed unused proximity sensor
  
  63   Thursday, November 22, 2012, 17:22 Isaac EarleStandard OperationTarget 1Active SumpRH Lab Active Sump Released On Wednesday November 21 at approximately
9am the level of the Remote Handling active
sump was inspected and found to be at approximately
  
  62   Tuesday, November 13, 2012, 16:26 Isaac EarleRepairTarget 1TargetManipulator Repair Complete Repair of the west side manipulator
in the west hot cell was completed today.
 Part of the repair was done by entering
  
  61   Wednesday, October 24, 2012, 17:38 Isaac EarleRepairTarget 2TargetT1 & T2 Target Ladder Control System Status During the recent shutdown for the
T2/M9 joint repair Graham Waters replaced
the corrupted application code on the controller
  
  60   Wednesday, October 24, 2012, 17:34 Isaac EarleRepairTarget 1TargetT1-MK2 Target Repair CompleteThe target ladder was detached, old delta
seals removed, sealing surfaces cleaned using
scotchbrite pad and a dremel tool, and delta
  
  59   Friday, September 28, 2012, 15:19 Isaac EarleRepairTarget 1TargetT1-MK2 Delta Seal Leak  After removal of the leaky
target cassette at position 3, plugs were
installed on the target ladder and a leak
  
  58   Tuesday, September 25, 2012, 16:31 Isaac EarleRepairTarget 1TargetT1/T2 Controls - The target control software was
modified to reference the correct pot. look-up
table for the target at T1 (T1-MK1)
  
  57   Thursday, September 13, 2012, 18:09 Isaac EarleMaintenanceTarget 1CoolingSeptember Shutdown T1 & T2 MRO The following tasks were performed
during the 2012 September Shutdown:
- Both targets moved to position
 IMG_0624.JPGIMG_0658.JPG 
  56   Friday, September 07, 2012, 16:39 Isaac EarleRepairTarget 1TargetRH Lab Crane Repaired The "west" button on the
crane pendant was broken, and the crane would
occasionally continue moving west when the
  
  55   Friday, September 07, 2012, 16:35 Isaac EarleRepairTarget 2TargetT2-MK1 Target Repair Completed - Profile monitor wiring harness
checked by Bill Rawnsley using resistor pack
--> OK
  
  54   Wednesday, August 08, 2012, 14:40 Isaac EarleRepairTarget 1TargetT1-MK1 Target Repair Complete- Re-wired profile monitor was received
from Probes Group and installed on the target
  
  53   Friday, July 27, 2012, 14:48 Isaac EarleRepairTarget 1TargetT1-MK1 Target Repair Update- T1MK1 target transferred from storage
pit to hot cell (max field: 4700 
  
  52   Monday, July 23, 2012, 16:01 Isaac EarleDevelopmentTarget 1TargetTarget Flask Seismic Restraint Clamps Installed Installation of the seismic restraint
clamps has been completed for the MK1 and
MK2 target flasks in the Remote Handling
 IMG_0427.JPGIMG_0428.JPGIMG_0429.JPG 
  51   Tuesday, July 17, 2012, 15:30 Isaac EarleDevelopmentTarget 1CoolingT1 & T2 Expansion Tank Level Warnings Added Mike Mouat and Juan Pon have modified
the control system so that the control room
will receive a message when the warning or
  
  50   Wednesday, July 11, 2012, 17:51 Isaac EarleRepairTarget 1TargetT1 Target Swap BL1A was started yesterday and brought
up to 10
  
  49   Monday, July 09, 2012, 17:17 Isaac EarleStandard OperationTarget 1TargetBL1A Start-Up Prep - T1 & T2 targets switched to
"remote" control
 - Both target ladders were moved
  
  48   Friday, July 06, 2012, 16:03 Isaac EarleRepairTarget 1TargetT1-MK2 Target Repair Complete Target elevation measurements and
beam spot plots were completed on the T1-MK2
target and the target is now fully repaired
 T1MK2_-_July_2012.pdf 
  47   Tuesday, July 03, 2012, 13:23 Isaac EarleStandard OperationTarget 2TargetT2 Plug Block Replaced & Beam Blockers TestedThe T2 plug block was replaced and the
M9 and M20 beam blockers were tested.  The
plug block did not interfere with the travel
  
  46   Friday, June 29, 2012, 14:18 Isaac EarleRepairTarget 1TargetManipulator Repair Complete Repair of the west side hot cell
manipulator was completed and the manipulator
was re-installed into the cell.  The
  
  45   Tuesday, June 26, 2012, 09:05 Isaac EarleMaintenanceTarget 1CoolingT1 & T2 Target Water Flow Transducers Serviced The target water outlet flow transducers
on the T1 and T2 cooling packages were serviced
(new shaft, paddle wheel, & o-ring) to
 T1_&_T2_water_flow.jpg 
  44   Friday, June 22, 2012, 13:54 Isaac EarleMaintenanceTarget 2TargetAir Amplifier Rebuild CompleteA full rebuild of the upper air amplifier
was completed.  New anodized aluminum
barrels were installed (replacing the old
  
  43   Friday, June 22, 2012, 13:48 Isaac EarleDevelopmentTarget 1CoolingT1 & T2 Expansion Tank Level Sensor Recording EnabledMike Mouat enabled recording for T1 and
T2 expansion tank warning and trip level
sensors on XTPAGE/XSTRIP.
  
  42   Thursday, June 21, 2012, 13:38 Isaac EarleStandard OperationTarget 2CoolingT2 Water Package Started The T2 water package was reconnected
to the target and started after being shut-off
since April 12, 2012.  The M9 and M20
  
  41   Monday, June 18, 2012, 16:27 Isaac EarleRepairTarget 1TargetT1-MK2 Profile and Protect Monitor Electronics Check Bill Rawnsley and Mike Russell performed
a 'blip' test on the T1-MK2 profile monitor
and protect monitors today.  A possible
  
  40   Friday, June 08, 2012, 17:01 Isaac EarleRepairTarget 1TargetT1-MK2 Leak Repair Update A leak check was performed on the
T1-MK2 target in the hot cell today and confirmed
successful leak-free installation of the
  
  39   Friday, June 08, 2012, 16:52 Isaac EarleRepairTarget 1TargetBroken Manipulator Tape Update The broken tape on the west side
hot cell manipulator was found to be one
of two "Z motion slave tapes".
  
  38   Thursday, June 07, 2012, 18:08 Isaac EarleRepairTarget 1TargetHot Cell Manipulator Broken Tape A tape snapped on the west side manipulator
today while working on the T1-MK2 target
repair.  The tape travels through to
  
  37   Wednesday, June 06, 2012, 08:58 Isaac EarleMaintenanceTarget 2TargetT2 Monolith Leak Check While leak checking components in
the M20 front end on May 25th, the top of
the T2 monolith was also checked by flooding
  
  36   Wednesday, June 06, 2012, 08:48 Isaac EarleRepairTarget 1TargetManipulator Repair Complete Repair of the west side hot cell
manipulator was completed and the manipulator
was re-installed into the hot cell.  No
  
  35   Wednesday, May 30, 2012, 15:39 Isaac EarleRepairTarget 1TargetWest Side Manipulator Removed from Hot Cell The west side manipulator was removed
from the hot cell using the new manipulator
removal frame.  The operation went smoothly
 IMG_0227.JPGIMG_0231.JPGIMG_0238.JPGIMG_0241.JPG 
  34   Monday, May 28, 2012, 17:17 Isaac EarleRepairTarget 2CoolingT2 Water Loss Update The T2 cooling package, the top of
the T2 monolith, and the Hansen water connections
which connect the package to the target were
  
  33   Thursday, May 24, 2012, 18:26 Isaac EarleRepairTarget 2CoolingWater Leak From T2 Cooling Package (Disconnected from Target) Today I noticed a "NOT OK"
signal from T2 water expansion tank warning
level sensor.  I checked the water level
  
  32   Monday, April 23, 2012, 09:55 Isaac EarleRepairTarget 1TargetHot Cell Manipulator Broken Cable While working on the leak repair
of the T1-MK2 target in the hot cell on Friday
April 20th, a cable snapped on the slave
  
  31   Thursday, April 12, 2012, 15:19 Isaac EarleMaintenanceTarget 2TargetT2 Target Water Drained In preparation for extended periods
of the T2 volume being vented during the
M20 repair, the T2 water package was shut-off,
  
  30   Wednesday, April 11, 2012, 17:02 Isaac EarleRepairTarget 2TargetT2 Vacuum Interlock & Expansion Tank Level Sensor The problem with the T2 vacuum interlock
was fixed by restarting the "Crate TG1"
control panel microprocessor.  The T1
  
  29   Thursday, April 05, 2012, 15:22 Isaac EarleMaintenanceTarget 1TargetT1 & T2 Profile and Protect "Blip" Test Diagnostics group completed their
"blip" signal response tests on
the T1 and T2 profile and protect monitors.
  
  28   Thursday, April 05, 2012, 12:14 Isaac EarleRepairTarget 1TargetT1 & T2 Profile MonitorsControls Group replaced the wiring and
wire harness for the profile monitor limit
switches on T2.  The monitor was actuated
  
  27   Wednesday, April 04, 2012, 15:51 Isaac EarleRepairTarget 2TargetBL1A UpdateVacuum interlock defeat jumpers were removed
for T1 and T2.  The interlock was tested
by venting the T1 and T2 volumes.  Both
  
  26   Tuesday, April 03, 2012, 15:55 Isaac EarleMaintenanceTarget 1TargetT1 Ladder Position Look-up Tables Updated Graham Waters has activated the appropriate
target ladder position look-up tables for
the T1-MK1 target which was installed in
  
  25   Monday, April 02, 2012, 15:18 Isaac EarleRepairTarget 1TargetT1-MK1 Installed in Beam Line The T1-MK1 target was transferred
from the storage pit to the beam line.  Services
were hooked up and the cooling package was
  
  24   Tuesday, March 27, 2012, 13:14 Isaac EarleRepairTarget 1TargetWater removal from T1 monolithAll water was removed from the base of
the target hole in the T1 monolith using
a suction tube device and wypalls.  Video
 downstream.jpgsouth.jpgupstream.jpgM13.jpg 
  23   Friday, March 23, 2012, 14:50 Isaac EarleRepairTarget 1TargetT1 Target Leak - UpdateThe T1-MK2 target was transferred from
the beam line to the hot cell.  Water
was seen in the bottom of the target pipe
  
  22   Thursday, March 22, 2012, 13:58 Isaac EarleRepairTarget 1CoolingT1 Package Water Leak - Update Vacuum group pumped down on the T1
& T2 volumes (because there is no cold
trap on the T1 pump) for approximately 1
  
  21   Wednesday, March 21, 2012, 17:28 Isaac EarleRepairTarget 1CoolingT1 Package Water Leak - Update The water level in the T1 cooling
package expansion tank was checked again
today approximately 24 hours after it was
  
  20   Tuesday, March 20, 2012, 10:31 Isaac EarleRepairTarget 1CoolingT1 Cooling Package - Potential Water LeakThe T1 expansion tank warning level sensor
had tripped and the level was approximately
1cm from the base of the tank.  No trip
  
  19   Tuesday, March 06, 2012, 15:27 Isaac EarleRepairTarget 1TargetQuick Connect Fittings on T1 Target The air hoses for the profile monitor
supply line were inspected and no cracking
was found (was found on T2).  The quick
  
  18   Tuesday, February 21, 2012, 09:56 Isaac EarleRepairTarget 2TargetAir Supply Check Valve & Q4 Flow Transducer The faulty air pressure supply check
valve for M9BB, M20BB, and T2 Profile Monitor
was replaced.
 T2_Q4_Flow_Transducer.JPG 
  17   Thursday, February 09, 2012, 17:19 Isaac EarleRepairTarget 1CoolingT1 & T2 General MRO The following work was performed
on the T1 cooling package:
- New filter housing installed for
  
  16   Thursday, February 02, 2012, 16:54 Isaac EarleRepairTarget 2CoolingT2 Device Air Line IssueWhile checking operation of the M9 and
M20 beam blockers earlier this week, a strange
noise was noticed coming from the T2 cooling
  
  15   Monday, January 30, 2012, 16:44 Isaac EarleMaintenanceTarget 1CoolingCompleted T1 Cooling Package MROReplaced
all o-rings and filters on the T1 cooling
package.  Replaced resin can.  Refilled
  
  14   Wednesday, January 25, 2012, 13:26 Isaac EarleMaintenanceTarget 2TargetM9BB Returned to Beam LineM9 beam blocker returned to beam line.
T2 target disconnected, picked up
using flask, and returned to beam line as
  
  13   Monday, January 23, 2012, 15:27 Isaac EarleRepairTarget 2TargetM20BB returned to beam line. M9BB moved to hot cell.M20 beam blocker was transferred from the
hot cell to the beam line.
M9 beam blocker was transferred from
  
  12   Friday, January 20, 2012, 10:23 Isaac EarleRepairTarget 2TargetM20 BB Shaft Bearing ReplacedThe replacement shaft bearing was machined
by Maico Dalla Valle and installed in the
beam blocker.  Smooth operation of the
 P1010788.JPGP1010808.JPG 
  11   Wednesday, January 18, 2012, 12:01 Isaac EarleRepairTarget 2TargetBroken M20BB Bearing Removed, New Design Complete The broken M20 beam blocker plastic
shaft bearing was removed.  Measurements
of the bearing as well as the shielding disc
 P1010779.JPGP1010778.JPGP1010781.JPGM20BB_Split_Flange_Shaft_Bearing.PDF 
  10   Friday, January 13, 2012, 17:04 Isaac EarleRepairTarget 2TargetBroken Part found on M20 Beam Blocker While wrapping up vacuum seal bearing
replacement on the M20 beam blocker I found
a piece of hard black material approximately
 P1010769.JPGP1010772.JPG 
  9   Thursday, January 12, 2012, 11:34 Isaac EarleMaintenanceTarget 2TargetReplaced M20 Beam Blocker Vacuum Seal O-Rings Replaced M20 beam blocker vacuum
seal o-rings.  Old o-rings were noticeably
harder, but not brittle or cracked.  Applied
  
  8   Friday, January 06, 2012, 15:37 Isaac EarleMaintenanceTarget 2TargetTransferred M20 beam blocker to hot cellUncovered T2 monolith and transferred M20BB to hot cell using flask.   
  7   Thursday, January 05, 2012, 10:21 Isaac EarleMaintenanceTarget 1CoolingDefeated T1 and T2 cooling package vacuum interlocks. Defeated T1 and T2 cooling package
vacuum interlocks at 1-C panel on South mezzanine
in Meson Hall to allow cooling packages to
  
  6   Thursday, January 05, 2012, 10:18 Isaac EarleMaintenanceTarget 2CoolingSwapped Resin in T2 Cooling PackageDrained T2 cooling package water, collected
sample and delivered to RPG.  Swapped
resin can, refilled, and restarted cooling
  
  5   Thursday, December 22, 2011, 15:27 Isaac EarleMaintenanceTarget 1TargetT1-MK1 Transferred to Storage Pit T1-MK1 target transferred from hot
cell to storage pit position #3 to free up
the hot cell in preparation for shut-down
  
  4   Tuesday, December 20, 2011, 09:54 Isaac EarleMaintenanceTarget 1TargetReplaced T1-MK1 Target LadderReplaced T1-MK1 target ladder with the
new ladder design which has an integrated
upper slide plate (2 less sealing locations)
  
  3   Friday, November 04, 2011, 13:36 Isaac EarleMaintenanceTarget 2TargetKaon Target (Training)  Moved Kaon Target from storage
pit to remote handling hot cell using flask
as training exercise.  Safety surveyor
  
  2   Thursday, June 30, 2011, 16:47 John WongDevelopmentTarget 1TargetTesting Elogblah blah blah.... fjda;jfeowifjoajglfa;nafg   
  1   Wednesday, June 29, 2011, 15:27 John Wong   testblah blah blah....   