Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-Meson Hall  Not logged in ELOG logo
Message ID: 316     Entry time: Thursday, February 02, 2023, 10:35
Author: Albert Kong 
Category: Maintenance 
Type: Target 1 
Specific: Cooling 
Subject: T1 Cooling Package Draining (Prep for Valve Replacement) 

Water reservoir in T1 started draining at ~7.30 am, will leave till tomorrow or overnight to fully drain. 

(Preparation to replace all leaky valves). 

Drained water samples collected for RPG. 

ELOG V2.9.2-2455