Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-Meson Hall  Not logged in ELOG logo
Message ID: 128     Entry time: Tuesday, November 18, 2014, 10:52
Author: Isaac Earle 
Category: Standard Operation 
Type: Target 1 
Specific: Active Sump 
Subject: RH Hot Cell Lab Active Sump Released 

Release of the Remote Handling Hot Cell Lab active sump water was completed today by Hua Yang.  During the procedure fields of up to 0.50 micro Sv/hr were measured around the newly installed filter housing.  After completion the filter was removed and replaced.  The filter measured 450cpm on the RM-14 monitor and ~5000cpm on the 44-2 monitor (both on contact).  RPG has been notified and the filter has been bagged, labeled, and left for pick-up by RPG.

ELOG V2.9.2-2455