Message ID: 22     Entry time: Thursday, March 22, 2012, 13:58
Author: Isaac Earle 
Category: Repair 
Type: Target 1 
Specific: Cooling 
Subject: T1 Package Water Leak - Update 

 Vacuum group pumped down on the T1 & T2 volumes (because there is no cold trap on the T1 pump) for approximately 1 hour this morning.  A significant amount of water was found in the base of the cold trap which confirms our suspicions of a water leak on the T1 target.

Tomorrow we will transfer the T1 target from the beam line to the hot cell for inspection, leak checking, and repair.