Message ID: 215     Entry time: Wednesday, March 15, 2017, 16:13
Author: Isaac Earle 
Category: Standard Operation 
Type: Other 
Specific: Active Sump 
Subject: Meson Hall Hot Cell Lab Active Sump Water Released 

 On March 13th in the morning the Meson Hall Hot Cell Lab active sump reached the high level sensor.  The system responded as expected:  high level panel warning light illuminated, siren sounded, and MCR notified via "B1 RCR1 RM6 WARN".  A 1L sample was delivered to RPG for analysis.  After approval, the sump was pumped out over the following two days.  The procedure in Document #64834 was followed for sampling and pump-out.