Message ID: 190     Entry time: Wednesday, March 16, 2016, 16:50
Author: Isaac Earle 
Category: Development 
Type: Target 2 
Specific: Controls 
Subject: Preliminary Testing of T2 Control System Complete 

Preliminary testing of the new PLC control system and EPICS interface was completed today for the T2 target, T2 cooling package, T2 collimators, and T1 thermocouples.  All systems behaved as specified.

Review of the commissioning plan is currently underway.

A scanned copy of the test plan is attached.

Attachment 1: T2_Testing_Checklist_-_Complete_-_March_16_2016.pdf  302 kB  | Show | Hide all