Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-Meson Hall  Not logged in ELOG logo
Message ID: 28     Entry time: Thursday, April 05, 2012, 12:14
Author: Isaac Earle 
Category: Repair 
Type: Target 1 
Specific: Target 
Subject: T1 & T2 Profile Monitors 

Controls Group replaced the wiring and wire harness for the profile monitor limit switches on T2.  The monitor was actuated remotely and functioned properly.

The T1 profile monitor was also tested and actuated properly.  The T1 monolith is now ready to be covered so that blocks may be removed from the M20 area.

ELOG V2.9.2-2455