Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-Meson Hall  Not logged in ELOG logo
Message ID: 15     Entry time: Monday, January 30, 2012, 16:44
Author: Isaac Earle 
Category: Maintenance 
Type: Target 1 
Specific: Cooling 
Subject: Completed T1 Cooling Package MRO 

Replaced all o-rings and filters on the T1 cooling package.  Replaced resin can.  Refilled package and restarted. 
Can inlet resistivity at 9.8MΩ *cm, outlet at 11.5MΩ*cm after approximately 3.5 hours.

(Collimator A filter and modified filter housing to be installed at a later date)

 

 

 

 

ELOG V2.9.2-2455