Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-Meson Hall  Not logged in ELOG logo
Message ID: 6     Entry time: Thursday, January 05, 2012, 10:18
Author: Isaac Earle 
Category: Maintenance 
Type: Target 2 
Specific: Cooling 
Subject: Swapped Resin in T2 Cooling Package 

Drained T2 cooling package water, collected sample and delivered to RPG.  Swapped resin can, refilled, and restarted cooling package.

After 6 hours can inlet at 10.3MΩ *cm, can outlet at 10.5MΩ*cm electrical resistivity.

 

 

 

 

ELOG V2.9.2-2455