Message ID: 284     Entry time: Monday, March 14, 2022, 14:09
Author: Adam Newsome 
Category: Maintenance 
Type: Target 2 
Specific: Cooling 
Subject: T2 cooling system: filled, tuned, leak-checked  

The T2 cooling system was refilled with water via the expansion tank until the tank level read approximately 38 cm.

The system pump was restarted. All sensors displayed acceptable nominal values. Demin flow was tuned to 1.0 gpm.

No leaks or abnormalities observed - system running normally.