Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-Meson Hall  Not logged in ELOG logo
Message ID: 159     Entry time: Friday, May 08, 2015, 09:48
Author: Isaac Earle 
Category: Standard Operation 
Type: Other 
Specific: Other 
Subject: BL1A Blocks Restored 

Replacement of the BL1A blocks was completed yesterday (May 8, 2015) in preparation for first beam down 1A on May 12th.  The attached PDF shows a photograph of the current arrangement, and also the block arrangement at the beginning of the 2014 running period for comparison.

Attachment 1: 1A_Shield_Blocks_Restored_for_1A_beam_2015_&_2014.pdf  811 kB  | Show | Hide all
ELOG V2.9.2-2455