M9 beam blocker returned to beam line.
T2 target disconnected, picked up using flask, and returned to beam line as training exercise.
Field @ 50cm from T2 target during removal: ~90,000μSv/hr
Resin can flask with new resin moved from hot cell lab to T1 cooling package area. |