Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-Meson Hall  Not logged in ELOG logo
Message ID: 46     Entry time: Friday, June 29, 2012, 14:18
Author: Isaac Earle 
Category: Repair 
Type: Target 1 
Specific: Target 
Subject: Manipulator Repair Complete 

 Repair of the west side hot cell manipulator was completed and the manipulator was re-installed into the cell.  The z-motion slave tapes, upper counterweight tapes, and lower counterweight tapes were replaced on both sides.

100cpm contamination was found on the slave arm from a wet wipe.  No contamination was found in the lab.

ELOG V2.9.2-2455