Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-Meson Hall  Not logged in ELOG logo
Message ID: 48     Entry time: Friday, July 06, 2012, 16:03
Author: Isaac Earle 
Category: Repair 
Type: Target 1 
Specific: Target 
Subject: T1-MK2 Target Repair Complete 

 Target elevation measurements and beam spot plots were completed on the T1-MK2 target and the target is now fully repaired and ready for use.  It will be returned to the storage pit when cranes are available.

A copy of the elevations measurements and beam spot plots is attached.

Attachment 1: T1MK2_-_July_2012.pdf  49 kB  | Show | Hide all
ELOG V2.9.2-2455