Message ID: 116     Entry time: Wednesday, May 14, 2014, 20:36
Author: Grant Minor 
Category: Development 
Type: Target 2 
Specific: Target 
Subject: Target exercised to position 0, then back to 2.0 mm above position 4 

The T2 target was exercised to position 0 around 6:15pm so that the T2 profile monitor could be used by operations.  The T2 water package was re-enabled when the target was in position 0, however this resulted in some trips of the cooling package.

Operations called around 7:45 to request return of the target to about 2mm above position 4.

The target position was re-set so that the position reading fluctuated roughly between 2.7 and 1.6 mm above position 4 (hovering roughly around 2.0 mm), and so the potentiometer reading was hovering roughly between 0.801 and 0.798.

The cooling package was re-started, and called operations to confirm the system was OK.