Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-Meson Hall  Not logged in ELOG logo
Message ID: 281     Entry time: Friday, March 11, 2022, 15:08
Author: Adam Newsome 
Category: Maintenance 
Type: Target 1 
Specific: Cooling 
Subject: Filters replaced: T1 cooling system 

All filters were replaced for the T1 cooling system: demineralizing resin circuit, target water system, and M15.

ELOG V2.9.2-2455