Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-Meson Hall  Not logged in ELOG logo
Message ID: 286     Entry time: Wednesday, April 13, 2022, 12:31
Author: Adam Newsome 
Category: Standard Operation 
Type: Target 2 
Specific: Target 
Subject: T2-MK2 moved: from target station to storage 

The T2-MK2 target was moved from the target station to the storage area (position 3). Upon removal, it was measured with a pole monitor at 0.5 m to be 960 mSv/h.

ELOG V2.9.2-2455