Message ID: 192     Entry time: Thursday, March 24, 2016, 15:38
Author: Isaac Earle 
Category: Development 
Type: Target 1 
Specific: Target 
Subject: T1/T2 Beryllium Target Test Jig Fabrication Complete 

Fabrication of the T1/T2 beryllium target testing jig (TBP1721) was completed today by Dan MacDonald.  With a target installed across the test ports, the inside volume pressurized with air to 103psi, and both ball valves closed, there was no noticeable drop in pressure over a 16 hour period.  This result was deemed satisfactory for use of the jig for hydrostatic testing of new targets.

 