Message ID: 212     Entry time: Monday, January 09, 2017, 15:07
Author: Isaac Earle 
Category: Standard Operation 
Type: Target 2 
Specific: Target 
Subject: T2-MK2 Target Moved from BL to HC 

 The T2-MK2 target assembly was moved from the beam line to the hot cell today.  A maximum field of 203mSv/hr was measured at approximately 0.5m

A steel shielding plug has been installed in the T2 hole to reduce shine and allow the T2 volume to be pumped down.