Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-Meson Hall  Not logged in ELOG logo
Message ID: 120     Entry time: Wednesday, August 13, 2014, 16:34
Author: Isaac Earle 
Category: Repair 
Type: Target 1 
Specific: Other 
Subject: Amplified Air Leak Narrowed Down to T1 Area 

 During the maintenance day today, amplified air to the T1 area was valved off in an attempt to pin point the location of the air leak.  The air amplifier cycle rate returned to normal with the T1 line valved off, indicating the leak is somewhere on the T1 profile monitor air cylinders, the T1 septum polarity switch, or on the supply lines to these devices.  Because these devices will not be used in the near future, the line will be left valved off.  Eric Chapman has applied a defeat tag to the valve and made an entry on the Cyclotron Logbook.

The cause of the leak will be investigated further during the 2014 Fall Mini-Shutdown

 

ELOG V2.9.2-2455