Message ID: 112     Entry time: Thursday, April 03, 2014, 16:35
Author: Isaac Earle 
Category: Standard Operation 
Type: Target 1 
Specific: Cooling 
Subject: T1 Cooling Package Started 

 The T1 cooling package was started around 2pm today.  There was no change to the T1 volume vacuum during startup.

The package was inspected for water leaks: None found.

The demin loop flow (Q2) was adjusted to ~1.5gpm.

The target out water resistivity has reached 12 mega-ohm-centimeters after approximately 2.5 hours, indicating that the resin does not need to be changed.