Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-Meson Hall  Not logged in ELOG logo
Message ID: 233     Entry time: Thursday, March 22, 2018, 17:24
Author: Isaac Earle 
Category: Standard Operation 
Type: Other 
Specific: Active Sump 
Subject: RH Lab active sump released 

 The RH Lab active sump level reached the high limit yesterday due to an overflow of the ultrasonic cleaner in the Rad Waste Area.  The sump was sampled by RPG, and after analysis the water was approved for release.  The water was pumped out today.  Local and MCR alarms functioned as expected.

ELOG V2.9.2-2455